Investor Presentaiton slide image

Investor Presentaiton

Narrabri Solid H1 production with successful rehand of longwall into 200 series · • ROM production 5.3Mt, up 9% on FY22 Consistent ROM production delivered strong H1 results Largest longwall move including rehanding of equipment successfully completed in June Slower than expected ramp up affected by third party delays on equipment overhauls impacted Q4 production 20 20 Managed ROM coal production (Mt) 69 7.3 6.9 6.3 6.4 6.1 4.8 4.1 5.3 1.7 H2 3H 3.6 H1 I FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24e Less than 250m depth of cover Guidance range 6.0-6.7Mt Greater than 250m depth of cover Back to less than 250m depth of cover
View entire presentation