Investor Presentaiton slide image

Investor Presentaiton

Marmato Mineral Reserves Marmato Mineral Reserves effective March 17, 2020 Tonnes Area Category (kt) Grade Au (g/t) Grade Ag Contained Au Contained Ag (g/t) (koz) (koz) Upper Mine Proven 802 5.2 22.1 133 569 Probable 4,342 4.0 14.2 555 1,981 Total 5,144 4.2 15.4 688 2,550 Lower Mine Proven Probable 14,556 2.9 3.8 1,333 1,799 Total 14,556 2.9 3.8 1,333 1,799 Total Proven 802 5.1 22.1 133 569 Probable 18,898 3.1 6.2 1,888 3,780 Total 19,701 3.2 6.9 2,021 4,348 Notes: 1. The mineral reserve estimate was prepared by Fernando Rodrigues, MAusIMM, and Joanna Poeck, SME-RM, of SRK, who are Qualified Persons as defined by National Instrument 43-101. 2. Totals may not add up due to rounding. 23 3. Mineral reserves are reported above cut-off grades of 2.23 g/t gold and 1.91 g/t gold for the Upper Mine, depending on mining method, and above 1.61 g/t gold for the Lower Mine. The cut-off grades are based on metal prices of USD$1,400 per ounce of gold, metallurgical recoveries of 85% and 95% in the Upper Mine, depending on location, and 95% for the Lower Mine, mining costs of USD$49.45 per tonne and USD$46 per tonne for the Upper Mine, depending on mining method, and USD$42 per tonne for the Lower Mine, G&A costs of USD$13.63 per tonne for the Upper Mine and USD$3 per tonne for the Lower Mine, processing costs of USD$12.24 per tonne for the Upper Mine and USD$14 per tonne for the Lower Mine, royalties of USD$8.96 per tonne for the Upper Mine and production taxes of USD$6.75 per tonne for the Lower Mine, without consideration of revenue from other metals. 4. 5. The Upper Mine is defined as the current operating mine levels above the 950 m elevation using cut and fill mining, and the Lower Mine is defined as below the 950 m elevation using mostly long hole open stoping methods. Cut and fill mining assumes dilution averaging 26% and mining recovery averaging 90%. Long hole open stoping assumes dilution of 8% and mining recovery of 92.5%. Mineral reserves from the Transition Mine, as described in the Pre-Feasibility Study, are now included in the Upper Mine mineral reserves. ARIS GOLD 23
View entire presentation