Investor Presentaiton
Mogollon Project Drilling and Target Areas
Mogollon
1,024 g/t AgEq
116 g/t Ag
10.8 g/t Au
(Outcrop)
LEGEND
Mogollon Claims
Prospective faults and
veins
Great Western Ext.
N
Golden Arrow
583 g/t AgEq
180 g/t Ag
4.9 g/t Au
2 km
Hughes/Tonopah
1,344 g/t AgEq*
344 g/t Ag
12.1 g/t Au
(Outcrop)
2,116 g/t AgEq
740 g/t Ag
17.0 g/t Au
(Outcrop)
2 km
4,058 g/t AgEq
397 g/t Ag
43.3 g/t Au
(Outcrop)
Maud Ext.
Last Chance Ext.
(Outcrop)
1,051 g/t AgEq*
170 g/t Ag
10.5 g/t Au
(Outcrop)
Consolidated Ext. Target
Current drilling area
represents 1% of total
vein and fault strike
length. Two drill rigs in
full operation.
AgEq** (g/t)
• 0-0.5
• 0.5-10
<- 10-50
50-100
O 100 2,450
Las Chispas*
213 g/t AgEq
70.9 g/t Ag
2 km
SilverCrest Metals Inc
1.7 g/t Au
(Outcrop)
1,484 g/t AgEq*
376 g/t Ag
13.4 g/t Au
(Outcrop)
2,155 g/t AgEq*
371 g/t Ag
21.3 g/t Au
(Outcrop)
2 km
Note: Grab samples are selective in nature and the resultant assays may not be representative of all mineralization on the project
*Previously released, See January 20th,,
2022 News Release
**AgEq is calculated using US$20/oz Ag,
US$1,800/oz Au, with metallurgical
recoveries of Ag - 90% and Au - 95%.
AgEq (Ag grade x Ag recovery)+((Au
grade x Au recovery) x (Au price / Ag
price)).
Summa Silver Corp. | TSXV:SSVR | OTCQX:SSVRF Frankfurt: 48X
Page 13View entire presentation