Flood levels and margins for inland sites Station Original designed flood level Revised levels taken for assessment (in meter) Emergency power DGs elevation (in meter) Margin available (in meter) # (in meter) RAPS-1&2 354.20 359.60* 356.6 (Original DGs) 366.6 (Retrofitted DG) 7.00 NAPS-1&2 180.80 187.30 6.50 KAPS-1&2 50.30 51.30 1.00 RAPS-3&4 359.60 384.30 24.70 Design is adequate- revision not required RAPS-5&6 359.60 393.30 33.70 KGS-1&2 38.90 41.30 2.40 KGS-3&4 38.90 41.60 2.70 •For RAPS-1&2, Upstream dam break is considered for revision of flood level for assessment. # Even though margins are available, Task forces assumed no margin and recommended various measures. Beyond this margins, core cooling can be maintained through hook up arrangements as recommended by task forces.