Investor Presentaiton
SITE INFRASTRUCTURE
Project's initial water treatment plant and tailings storage facility are already established
Existing water and tailings infrastructure
SOUTH32
Water
Additional capital required to establish water wells and a second water treatment plant
The first water treatment plant is installed and treatment upgrades are expected to be
commissioned in Q3 FY22
Construction to support critical path orebody dewatering is planned to commence in
H2 FY22
•
Second water treatment plant expected to be commissioned in Q4 FY23
Tailings storage
• We have completed the remediation of historic tailings, establishing the first of
two state-of-the-art dry stack tailings storage facilities (TSF)
• Approximately half of Taylor's planned tailings are to be sent underground as paste fill,
reducing its surface environmental footprint
First TSF on patented land, with several State-based permits already received for
dewatering
•
Subsequent expansion of tailings storage capacity to require Federal permitting
•
Power
Site power expected to be met through a grid-connected high voltage transmission
line
Discussions initiated to secure 100% renewable energy from local providers
Services and labour
Excellent access to local service providers and skilled labour
SLIDE 13View entire presentation