Goldboro 2021 Feasibility Study: A Robust Open Pit Project
Cautionary Note Regarding Forward-Looking Information
This presentation contains statements which constitute "forward-looking information" within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of Signal Gold Inc. with respect to future
business activities and operating performance. Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" or similar expressions and include information
regarding: (i) the amount of future production over any period; (ii) assumptions relating to revenues, operating cash flow and other revenue metrics set out in the Company's disclosure materials; and (iii) future exploration and development plans.
Investors are cautioned that forward-looking information is not based on historical facts but instead reflect management's expectations, estimates or projections concerning future results or events based on the opinions, assumptions and estimates of
management considered reasonable at the date the statements are made. Although Signal Gold believes that the expectations reflected in such forward-looking information are reasonable, such information involves risks and uncertainties, and undue reliance
should not be placed on such information, as unknown or unpredictable factors could have material adverse effects on future results, performance or achievements of the combined company. Among the key factors that could cause actual results to differ
materially from those projected in the forward looking information are the following: the requirement for additional funding for development and exploration; the fluctuating price of gold; success of exploration, development and operations activities; health,
safety and environmental risks and hazards; uncertainty in the estimation of mineral reserves and mineral resources; replacement of depleted mineral reserves; the potential of production and cost overruns; obligations as a public company; risks relating to
government and taxation regulation; volatility in the market price of the Company's securities; risks relating to title and First Nations; risks relating to the construction and development of new mines; risks relating to the dependence of the Company on outside
parties and key management personnel; and risks in the event of a potential conflict ofinterest.
This information is qualified in its entirety by cautionary statements and risk factor disclosure contained in filings made by Signal Gold Inc., including Signal Gold annual information form, financial statements and related MD&A for the year ended December 31,
2021, all available at www.sedar.com. Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking information prove incorrect, actual results may vary materially from those described herein as intended,
planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that
cause results not to be as anticipated, estimated or intended. Signal Gold does not intend, and does not assume any obligation, to update this forward-looking information except as otherwise required by applicable law.
Cautionary Note
Cautionary statement NI 43-101: The Goldboro Gold Project Feasibility Study ("FS") was prepared in accordance with NI 43-101 and results were announced on December 16, 2021 and filed on January 20, 2022. The FS was completed by Nordmin Engineering
Ltd. ("Nordmin") as Lead Mining, and Geological Consultant. Ausenco Engineering Canada Inc. ("Ausenco") acted as Metallurgical and Processing Consultant, Knight Piésold Ltd. ("Knight Piésold") as Tailings Consultant, GHD Ltd. ("GHD") as Site Water
Management and Environmental Consultant, Lorax Environmental Services Limited ("Lorax") as Geochemistry Consultant, and McCallum Environmental Ltd. ("McCallum") as Consultation and Permitting Consultant. Please see the 'NI 43-101 Technical Report
and Feasibility Study for the Goldboro Gold Project, Eastern Goldfields District, Nova Scotia' on January 11, 2022, for further details.
Use of Non-IFRS Measures
This Presentation may from time to time refer operating cash costs per ounce sold, all-in sustaining costs per ounce of gold sold, and earnings before income taxes, depreciation and amortization ("EBITDA"), because certain readers may use this information to
assess the Company's performance and also to determine the Company's ability to generate cash flow. This data is furnished to provide additional information and are non-IFRS measures and do not have any standardized meaning prescribed by International
Financial Reporting Standards ("IFRS"). These measures should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS and are not necessarily indicative of operating costs presented under IFRS. Refer to the
Company's most recent MD&A for the definition and reconciliation of these measures.
All dollar amounts in this presentation are expressed in Canadian Dollars (C$) unless otherwise noted.
TSX: SGNL | OTCQX: SGNLF