Energy Transfer Corporate Presentation slide image

Energy Transfer Corporate Presentation

Permian Basin Processing Expanding to Meet Growing Demand روس ENERGY TRANSFER Permian Basin plant inlet volumes remain near record highs Gaines Borden Dawson Eddy Loa Martin Howard Androws Bear Ector Midland Glasscock Loving Grey Wolf Winkler Permian Basin Footprint ➤ Extensive Permian Basin Footprint: . Have significant acreage dedications to ET processing plants in the Permian Basin Permian Bridge Pipeline • • • Converted ~55 miles of existing 24-inch NGL pipeline to rich-gas service to allow ~200 thousand Mcf/d of rich-gas to move out of the Midland Basin to the Delaware Basin Phase I was placed in service in October 2021 and an expansion was placed into service in Q1 2022 Heavily utilizing to provide operational flexibility between processing facilities in the Delaware and Midland Basins Grey Wolf and Bear Processing Plants Culberson Processing Plant (In Progress) Processing Plant Gas Gathering Pipeline NGL Pipeline Other Natural Gas Pipelines ° 5 10 15 20 Mi Reeves N A Ward Pecos Crane • 200 MMcf/d cryogenic processing plants • Reagan Upton • Crockett • Grey Wolf plant placed in service in December 2022; Bear plant placed in service in June 2023 Due to significant producer demand, continue to evaluate the necessity and timing of adding another processing plant in the Permian Basin while considering any available new capacity that we acquired via the Crestwood acquisition The volumes from the tailgate of these plants will utilize Energy Transfer gas and NGL pipelines for takeaway from the basin 14
View entire presentation