Permian Basin Processing Expanding to Meet Growing Demand
روس
ENERGY
TRANSFER
Permian Basin plant inlet volumes remain near record highs
Gaines
Borden
Dawson
Eddy
Loa
Martin
Howard
Androws
Bear
Ector
Midland
Glasscock
Loving
Grey Wolf
Winkler
Permian Basin Footprint
➤ Extensive Permian Basin Footprint:
.
Have significant acreage dedications to ET processing plants in the
Permian Basin
Permian Bridge Pipeline
•
•
•
Converted ~55 miles of existing 24-inch NGL pipeline to rich-gas
service to allow ~200 thousand Mcf/d of rich-gas to move out of the
Midland Basin to the Delaware Basin
Phase I was placed in service in October 2021 and an expansion was
placed into service in Q1 2022
Heavily utilizing to provide operational flexibility between processing
facilities in the Delaware and Midland Basins
Grey Wolf and Bear Processing Plants
Culberson
Processing Plant (In
Progress)
Processing Plant
Gas Gathering
Pipeline
NGL Pipeline
Other Natural Gas
Pipelines
°
5
10
15
20
Mi
Reeves
N
A
Ward
Pecos
Crane
•
200 MMcf/d cryogenic processing plants
•
Reagan
Upton
•
Crockett
•
Grey Wolf plant placed in service in December 2022; Bear plant
placed in service in June 2023
Due to significant producer demand, continue to evaluate the
necessity and timing of adding another processing plant in the
Permian Basin while considering any available new capacity that we
acquired via the Crestwood acquisition
The volumes from the tailgate of these plants will utilize Energy
Transfer gas and NGL pipelines for takeaway from the basin