Funding PNG's Electrification: Vanimo Case Study slide image

Funding PNG's Electrification: Vanimo Case Study

Annual cumulative cashflow (millions) (USD) Under the same parameters, taking on grid connection costs and operating as a retail supplier impacts the business case Comparison of returns on renewable generation options $.0 Hydroelectricity <0% internal rate of return LCOE (USD/KW) 0.21 Biomass <0% internal rate of return ■ LCOE (USD/kW) 0.19 INDICATIVE Solar with Battery Storage <0% internal rate of return LCOE (USD/kW) 0.35 -$2.0 -$4.0 -$6.0 -$8.0 -$10.0 -$12.0 Year 1 Source: Palladium Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Solar with Battery Storage Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Hydro ■Biomass Year 18 Year 19 Year 20 Year 21 Year 22 Year 23 Year 24 Year 25 18