Investor Presentaiton
CRE is currently working with CAISO and CENACE to develop shared grid
reliability protocols to strengthen energy security on both sides of the border
CALIFORNIA
A Otay Mesa
(SDG&E)
Tijuana
A Imperial
Valley
(SDG&E, IID)
La Rosita
ARIZONA
A Three A Citizen
Points Utilities
(TECI) (UNSES)
A Diablo A Azcárate
(EPECO) (EPECO)
Sásabe
Santa Cruz
Paso del
Norte
Valle de
Juárez
NUEVO
MEXICO
CRE
| Due to the close bilateral relationship |
I between both countries, Mexico supported |
I the U.S. during the power outage in I
I California in 2011. In return, the U.S. I
I supported Mexico in 2016, when there was
also a power outage in Baja California.
4
11 interconnection points
with the US
Voltage
40 kV
Source: CENACE (2016)
230 kV
115 kV
161 kV, 138 kV and <34.5 kV
Substation
A Eagle
Pass
(AEP)
36 MW
Piedras
Negras
TEXAS
100 MW A Laredo
(AEP)
Nuevo
Laredo
A Falcón A Planta Frontera
(AEP) (AEP)
300 MW
Guerreño
A Rail Road (SU)
A Military Highway (AEP)
A Bronswille (AEP)
Matamoros
32View entire presentation