2021 Work Programs slide image

2021 Work Programs

Ohra-Takamine: Central mine corridor long-section with historic workings and drill holes JAPAN GOLD CORP. Ohra-Takamine Central Mine Corridor Long Section (Looking NW) 500m Om Urushi Mine: 3,000 ounces of gold produced at an average grade of 9.1 g/t Au and 18.6 g/t Ag OTDD20-001 -500m JAPAN GOLD Takamine Mine: 1,600 ounces of gold produced at an average grade of 5.1 g/t Au, 28.3 g/t Ag 59MAHT-2 OTDD20-002 OTDD19-001 500m 61MAHT-4 60MAHT-2 63MAHT-5 61MAHT-3 61MAHT-5 61MAHT-2 615.5m 620.0m 651.5m 660.0m 650.0m 602.0m Production data referenced from: 620.0m 600.4m 59MAHT-3 1455.0m 584.0m 679.6m Om Ohra Mine: >28,000 ounces of gold produced, including 21,000 ounces mined at grades >20 g/t Au 1) Michitoshi, Miyahisa, 1967: Report of gold deposits survey in Takamine/Ohra district, Kagoshima prefecture, Association of Kagoshima Prefecture mineral resources development promotion. 2) Gold Mines of Japan, 1989. The Mining & Materials Processing Institute of Japan. 0 500 1000 meters TSXV: JG | OTCQB: JGLDF LEGEND Japan Gold drill hole MMAJ drill hole Sinter outcrop Historic production 37
View entire presentation