2021 Work Programs
Ohra-Takamine:
Central mine corridor long-section with historic workings and drill holes
JAPAN
GOLD
CORP.
Ohra-Takamine
Central Mine Corridor
Long Section (Looking NW)
500m
Om
Urushi Mine: 3,000 ounces of gold produced at
an average grade of 9.1 g/t Au and 18.6 g/t Ag
OTDD20-001
-500m
JAPAN
GOLD
Takamine Mine: 1,600 ounces of gold
produced at an average grade of 5.1 g/t Au, 28.3 g/t Ag
59MAHT-2
OTDD20-002
OTDD19-001 500m
61MAHT-4
60MAHT-2
63MAHT-5
61MAHT-3 61MAHT-5
61MAHT-2
615.5m
620.0m
651.5m
660.0m
650.0m
602.0m
Production data referenced from:
620.0m
600.4m
59MAHT-3
1455.0m
584.0m
679.6m
Om
Ohra Mine: >28,000 ounces of gold produced,
including 21,000 ounces mined at grades >20 g/t Au
1) Michitoshi, Miyahisa, 1967: Report of gold deposits survey in Takamine/Ohra district,
Kagoshima prefecture, Association of Kagoshima Prefecture mineral resources development promotion.
2) Gold Mines of Japan, 1989. The Mining & Materials Processing Institute of Japan.
0
500
1000
meters
TSXV: JG | OTCQB: JGLDF
LEGEND
Japan Gold drill hole
MMAJ drill hole
Sinter outcrop
Historic production
37View entire presentation