Hunting for the Next Gold Mine in Côte d'Ivoire
Mako Gold
GOGBALA - TO BE INCLUDED IN MAIDEN RESOURCE
225,000 mE
A
4m @ 2.72g/t Au
23m @ 1.81g/t Au
6m @ 4.97g/t Au
8m @ 4.29g/t Au
11m @ 1.56g/t Au
3m @ 6.40g/t Au
3m @ 9.41g/t Au
1m @ 17.93g/t Au
2m @1.76g/t Au and
4m @ 2.55g/t Au
1,004,000 mN
35m @ 1.72g/t Au
200m
1,003,000 mN
00
2km
226,000 mE
4m @ 1.25g/t Au and
9m @ 1.00g/t Au
4m @ 1.38g/t Au and
11m @ 1.10g/t Au and
5m @ 2.38g/t Au
11m @ 1.67g/t Au
9m @ 2.52g/t Au
20m @ 3.41g/t Au
2m @ 16.81g/t Au and
5m @ 2.12g/t Au
8m @ 2.87g/t Au
10,000m of RC/DD drilling underway
✰ Wide and high-grade gold mineralisation
outlined over 2km in wide-spaced drilling
Structure and mineralisation similar to
Tchaga with same stacked lodes
Select drill results include¹
◆ 20m at 3.41g/t Au from 19m
♦ 12m at 5.39g/t Au from 11m
7m @ 2.73g/t Au
♦ 7m at 6.70g/t Au from 6m
4m @ 2.63g/t Au
010
◆
35m at 1.72g/t Au from 43m
7m @ 6.70g/t Au
12m @ 5.39g/t Au
◆
23m at 1.81g/t Au from 19m
[email protected]/t Au
Drill Hole Collar
(Au gram metres)
◆
20m at 1.92g/t Au from 33m
CO
High-priority drill target to extend
wide high-grade mineralised zone
along Napié Fault
>50
10 to 50
5 to 10
O
1 to 5
<1
Pending assays
Gold Soil Contour
+40 ppb Au
Structure
-Napie fault (D1)
-- Later fault (D2)
♦ 2m at 16.81g/t Au from 2m
◆ 8m at 4.29g/t Au from 82m
◆ 6m at 4.97g/t Au from 68m
Gogbala Prospect Plan View on IP Background
1 Refer to ASX announcements dated 9 July 2018, 13 March 2019, 15 March 2021,
October 2021, and 13 October 2021
14View entire presentation