Karcham Wangtoo Plant - Overview
HIMACHAL
PRADESH
Kyelang
©
KINNAUR
©
Reckong Peor
Location
Kinnaur District, Himachal Pradesh
Concession Details
•
Operational concession till September 20511
CHINA
30
LARCHIAM
Commission Details
•
BAM
13th September 2011
SW
Capacity
•
1,000² MW
Saleable Capacity
•
880 MW
Design Energy
•
4,131 million units
Total Power
•
FY20: 4,615 million units
Generated
Plant Availability
Factor
•
Karcham Wangtoo hydro plant is located on river Sutlej
Its diversion dam is located at village Karcham and the powerhouse is located
near village Wangtoo on NH-5
The project comprises of 44.60 km of tunneling in the Himalayan geology
The concrete gravity dam used to generate power is 88m high, 53m of which is
below the riverbed level
The plant's pressure shafts feed four generating units of 250MW each, installed
in an underground powerhouse at Wangtoo
PPA
Plant Availability maintained above normative level
(90%) for FY13-20
Signed PPA through PTC India Ltd. for entire saleable
capacity till September 20463
12% free power of the electricity generated is to be
supplied to the Government of Himachal Pradesh
revising to 18% during FY24
Equipment suppliers
ANDRITZ VOITH ABB ALSTOM
Turbine
Generator
Generator
Transformer
400kV GIS
JSW Energy
(1) With a provision to extend for a period of 20 years mutually agreed upon
(2) Current approved operational capacity at 1,000 MW. Awaiting CEA approval for uprating to 1,091 MW
(3) PPA close date with provision to extend for mutually agreed upon period