Investor Presentaiton slide image

Investor Presentaiton

CHAMBA LAULAND SPITI Chamba KANGRA Dharamsala KULLU Mandi D Kullu Hamirpur UNA HAMIRPUR Ura MANDI BILASPUR Bilaspur SHIMLA Solan OSHIMLA SOLAN Sirmaur SIRMAUR Karcham Wangtoo Plant - Overview HIMACHAL PRADESH Kyelang © KINNAUR © Reckong Peor Location Kinnaur District, Himachal Pradesh Concession Details • Operational concession till September 20511 CHINA 30 LARCHIAM Commission Details • BAM 13th September 2011 SW Capacity • 1,000² MW Saleable Capacity • 880 MW Design Energy • 4,131 million units Total Power • FY20: 4,615 million units Generated Plant Availability Factor • Karcham Wangtoo hydro plant is located on river Sutlej Its diversion dam is located at village Karcham and the powerhouse is located near village Wangtoo on NH-5 The project comprises of 44.60 km of tunneling in the Himalayan geology The concrete gravity dam used to generate power is 88m high, 53m of which is below the riverbed level The plant's pressure shafts feed four generating units of 250MW each, installed in an underground powerhouse at Wangtoo PPA Plant Availability maintained above normative level (90%) for FY13-20 Signed PPA through PTC India Ltd. for entire saleable capacity till September 20463 12% free power of the electricity generated is to be supplied to the Government of Himachal Pradesh revising to 18% during FY24 Equipment suppliers ANDRITZ VOITH ABB ALSTOM Turbine Generator Generator Transformer 400kV GIS JSW Energy (1) With a provision to extend for a period of 20 years mutually agreed upon (2) Current approved operational capacity at 1,000 MW. Awaiting CEA approval for uprating to 1,091 MW (3) PPA close date with provision to extend for mutually agreed upon period 18
View entire presentation