The Parex Advantage
LLA-34: Replicating Success from Cabrestero
Basin: LLA-34 (Llanos)
■
◉
Non-Operator
W.I.: 55%
Focused on accelerating production,
minimizing decline and delineation
A
Current development plan includes down spacing and waterflood injection
■ Down spacing to ~40 acres and waterflood injection pattern
■
Major facility expansion to ~610 kbfpd in 2023 to accelerate oil recovery
Operational reliability has been improved by the electrification of the block
National grid tie-in completed H2 2022
Maximizing delineation efforts though utilization of sidetrack options
■
Roughly 10 horizontal well locations have been identified for future exploitation
PRODUCTION & CAPITAL FORECAST PROFILE (NET)(1)
LLA-34
34
34
32
30
$70
2020A
$85
2021A
$120
2022A
Capital Expenditures ($MM) (2)
(1) After 2023F, budgets and forecast have not been finalized and are subject to a variety of factors, including prior year's results; see "Forward-Looking Statements and Financial Outlook" advisory. (2) Non-GAAP financial measure; see advisory.
$120
2023F
29
$80.
2024F
$25
2025F
-Production (kboe/d)
31View entire presentation