J-ABWR Experience of Beyond DB Earthquake
Kashiwazaki Kariwa (KK)6/7: Chuestu-Oki Earthquake: July
16, 2007
- Observed Peak Acceleration at Reactor Building Lowest Level
Horizontal
Vertical
KK-6
0.33 g
0.50 g
US-ABWR Design Basis
Peak ground acc.
=0.3 g for SSE
KK-7
0.36 g
0.36 g
- KK-7 in Operation accomplished Major Safety Functions
- Fundamentally Same Seismic Design in US-ABWR
IAEA Mission Report (Feb. 26, 2008)
'From the presentations made by TEPCO experts as well as reports by the regulatory
authority NISA, and as was confirmed by plant walkdowns performed by IAEA experts, it is
indicated that the safety related structures, systems and components of all seven
units of the plant (in operating, start-up and shut down conditions) demonstrated
exceptionally good apparent performance in ensuring the basic safety functions
concerning control of reactivity, cooling and confinement.'