First Quarter 2022 Earnings Report
AFFORDABLE AND
CLEAN ENERGY
CLIMATE
ACTION
INTERNAL
Renewables expansion update
Projects in execution
enel
Net Installed
Capacity (MW)
Finis Terrae
1261
End of
Construction
2022
Boosting H2
Enel Chile is developing the First
pilot project for green hydrogen
production in Chile
PMGD
(I & II)
862
2022-23
JV with AME (HIIF)
Campos del Sol II
398
2022
• Santiago
Sierra Gorda
375
2023
##
Renaico II
144
2023
Los Cóndores
150
2023
La Cabaña
106
+30
BESS
+30MW
Expected to be operational in
2022
3.4 MW
1.25 MW
2023
Rihue
120
BESS
+30MW
2024
24
24
1.
Includes 12 MW and 22 MW connected during Q1 2022 and Q4 2021 respectively.
2.
Includes San Camilo (3 MW) and Dadinco (3 MW) that were connected to the system during 2021 and Caracoles (3 MW) that was connected during
Q1 2022.
One of the best wind
conditions due to its
Magallanes proximity to AntarcticaView entire presentation