Summary of Interim Results 2022 slide image

Summary of Interim Results 2022

System of Technology-enabled Construction Traditional construction Technology-enabled construction COUNTRY GARDEN 碧桂園 30° 初心一良心、匠心 Planning and design BIM Design Materials management Prefabricated construction components Construction works Construction Robots Project operation and maintenance Digitalized management Carrying out in-depth design and modelling with BIM, thus providing a basic information platform for intelligentized management Combining prefabricated plates for walls, prefabricated staircases and prefabricated protruding window frames with such new-technology products as plastic formwork and pre-shaped rebars for efficient, coordinated operation Designing and developing robots for architectural construction and other types of construction to advance construction efficiency, through a substitution of construction works that previously conducted by manpower Realizing Al-enabled decision-making through a management system that covers the entire life cycle of a project from design, construction works to operation and management 19
View entire presentation