Investor Presentaiton slide image

Investor Presentaiton

. • • • Kobada Main Deposit - Over 5km of Strike Large, shallow and well drilled open pittable Mineral Resource Kobada Main is a large, continuous deposit extending over 5km at surface level Mineral Resources of 2.4Moz defined within a 4.5km long open pit with close spaced, near surface drilling Kobada is predominantly oxide and remains open along strike in both directions, as well as being open at depth Low stripping ratio with free dig oxide mineralisation from surface Kobada Deposit 4.5km • Opportunity to include Foroko in forthcoming DFS Update • Resource estimate is constrained within RPEEE pit shell using US$1,950/oz and prevailing costs Kobada Deposit Material Indicated Inferred Total Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) Oxide 38 0.80 0 0.96 17 (Moz) 0.93 3 0.51 55 0.84 1.4 (g/t) Fresh 22 0.79 0.57 9 1.16 0.35 32 0.90 0.92 Total 60 0.79 1.53 27 1.01 0.86 87 0.86 2.39 Kobada Main 4.5km Kobada Main TOUBANI RESOURCES RPEEE Shell Foroko Au ppm Mineral Resource 0-0.1 0.1-0.3 0.3-0.6 0.6-1 1-2 ☐ 2-3 3-99 Foroko RPEEE Shell Mineral Resource Weathering Laterite Saprolite Transitional Fresh Note: Refer Company's announcement dated 18 August 2023. Mineral Resource cut-off grade of 0.25 g/t Au for oxide, 0.30g/t Au for fresh was applied. Refer Slide 32 for additional information. RPEEE: Reasonable Prospects of Eventual Economic Extraction 11
View entire presentation