Investor Presentaiton
Increased Resource
Demonstrated ability to efficiently increase Resource
size and confidence with each drilling program
Pacifico has undertaken three phases
of drilling that have:
Increased the total Resource tonnage by more
than 50%; and
Approximately tripled the contained metal
classified as a Measured and Indicated Resource.
Phase IV Drilling recently concluded:
Pb Eq. (kt)
2,000
1,500
1,000
Phase I
Drilling
Phase II
Drilling
500
5,372 m
6,000 m
Phase III
Drilling
3,265 m
Pacifico
Minerals Ltd
0
MRE at Acquisition
MRE Mar. 2019
Inferred
MRE Oct. 2019
■Measured & Indicated
MRE June 2020
Image; Mineral Resource Estimate growth since acquisition in 2018
2Mineral Resource Estimates reported at 1.0% Pb cut-off, Zn is not included. ³Refer to appendix for Pb Equivalent calculations
Preliminary observations from brown-fields exploration drill holes suggest very positive impacts for the Resource and pit designs.
•
•
58 drill holes completed for 4,803m
•
Significant assay results received to date:
•
SHDD002: 17m at 9.5% Pb and 67g/t Ag from 15m
SHDD003: 16m at 6.8% Pb and 102 g/t Ag from
58m
SHDD005: 9m at 5.9% Pb and 67 g/t Ag from 11m
Additional Assay result expected through
December and January.
Resource Estimate update Q1 2021.
Phase V Drilling Program Planned for Q2 2021.
See ASX announcement 20 November 2020 for further information
NW
8289900m 497800m
SORBY HILLS - B DEPOSIT
SHDD034
CROSS SECTION
OmRL
40m
55m
Recent Drill Hole
Historical Drill Hole
Intervals of Logged Mineralisation
2020 MRE Outline
PFS Whole Ore Option Pit
SHDD032
Revised Mineralisation
Envelope
Transported
Saprolite
Siltstone (Knox Formation)
Sedimentary Breccia (Transition Formation)
Dolomite (Sorby Dolomite)
498000m 8289700mN
SHDD030
SE
NW
497900mE
8290900mN
496100mE 8290700m
SORBY HILLS - OMEGA DEPOSIT
CROSS SECTION
SURFACE
D'
B
BASE OF COMPLETE OXIDATION-
TOP OF FRESH ROCK
OmRL
OPEN
73m
100m
-100mRL
-200mRL
Cross section through the B Deposit showing observed mineralisation in the newly completed drill holes SHDD030,
SDDSH032 and SHDD034 relative to the current Resource envelope and open pit design.
SHDD046
52m
70m
Revised Mineralisation:
Envelope
Transported
Saprolite
SHDD039
Recent Drill Hole
Historical Drill Hole
Intervals of Logged Mineralisation
2020 MRE Outline
Siltstone (Knox Formation)
...PFS Whole Ore Option Pit
Sedimentary Breccia (Transition Formation)
Dolomite (Sorby Dolomite)
OPEN
100m
SE
SURFACE
B'
BASE OF COMPLETE OXIDATION
TOP OF FRESH ROCK
-100mRL
-200mRL
Cross section [B-B'] through the southern portion of the Omega deposit showing observed mineralisation intersected in
newly completed drill holes SHDD039 and SHDD046 relative to the current Resource envelope and open pit design.
Pacifico Minerals Limited ASX:PMY
11View entire presentation