Q3 and Q4 2023 Corporate Highlights slide image

Q3 and Q4 2023 Corporate Highlights

Kışladağ Kışladağ is a low-grade, bulk-tonnage, open pit operation that uses heap leaching for gold recovery OVERVIEW Location Uşak Province, Türkiye Ownership 100% Mine type Open pit, heap leach Metals mined Gold Deposit type Processing method Gold porphyry Heap leach Black Sea RESERVES AND RESOURCES (2) Contained Tonnes Grade (x1000) (g/t Au) Ounces (x1000 Au) P&P Reserves 176,576 0.67 3,759 Ankara © M&I Resources 330,317 0.59 6,290 Inferred Resources 7,529 0.44 107 TÜRKIYE GREECE Kışladağ Life of mine 2022 Results 13 years based on Reserves 135,801 ozs produced at $1,000/oz AISC(1) and C1 Cost (1) of $773/oz sold Production: 154,850 ozs 2023 FY Results (3) Q3 YTD: Cash Operating Cost (C1)(1): $671/oz sold eldorado gold (1) (3) Mediterranean Sea Europe • Enhancing Efficiencies Kışladağ opportunity to increase throughput and recoveries beyond planned 56% Completed commissioning of the fine-ore agglomeration circuit, and is performing as expected; Upgraded materials handling and agglomeration systems These are non-IFRS financial measures or ratios. See Slide 2 'Non-IFRS Measures' for more information. Please refer to the Appendix for more information with respect to the mineral resources and mineral reserves. Preliminary Gold Production as announced on January 15, 2024. Please refer to the news release for more information. 19
View entire presentation