Investor Presentaiton slide image

Investor Presentaiton

Coal Handling and Logistics Capability Summary Only IPP in India to have in-house coal logistics capability (mine to plant) > 4,000 man-years of experience in coal logistics Largest customer of Indian Railways after NTPC - Approx. 5,000 rakes loaded annually, peak capacity of 16 rakes handled simultaneously Developed own siding for coal movement from Korba coalfields Developed its own state of the art coal logistics monitoring and control system Smooth Handling of approx. 45 MTPA of coal annually by APL resulting in lower inventory requirement Constitutes 6.5% of total coal consumption for thermal power plants in India All projects have excellent infrastructure facility for faster handling of rakes. Some Examples are as below Tiroda - - 3 wagon tipplers for handling BOXN rakes, 1 track hopper for handling BOBRN rakes - 9 lines within plant to ensure adequate rail infrastructure Kawai = 2 Wagon Tipplers for handling BOXN Rakes 1 Track Hopper for handling BOBRN Rakes 6 lines within plant to ensure adequate rail infrastructure REL, Tilda 3 Wagon Tipplers for handling BOXN Rake. 4 nos truck tippler unloading facility - 6 lines within plant to ensure adequate rail infrastructure. Plant and Mine Locations adani Power NCL Kawai Schars Mundra SECL Korba Godda Tilda Dhamra WCL Umrer Tiroda SECL Korea Rewa MCL Talcher Raigarh MCL IB REGL, Raigarh Due to proximity of coal mines, Coal is transported through Road/RCR mode with 2 nos truck tipplers. Railway system under commission. Map not to scale. For illustration purposes only, BOBRN - Bogie Open Bottom Rapid with pNeumatic door opening actuators, WCL - Western Coalfields Limited, SCCL - Singareni Collieries Company Limited, SECL - South Eastern Coalfields Limited, MCL Mahanadi Coalfields Limited, NCL - Northern Coalfields Limited Udupi Mangalore scCL APL Plants Mines Port for Imported Coal PPA counterparty states for APL 17
View entire presentation