Investor Presentaiton
Coal Handling and Logistics Capability
Summary
Only IPP in India to have in-house coal logistics capability (mine to
plant)
> 4,000 man-years of experience in coal logistics
Largest customer of Indian Railways after NTPC
-
Approx. 5,000 rakes loaded annually, peak capacity of 16 rakes
handled simultaneously
Developed own siding for coal movement from Korba coalfields
Developed its own state of the art coal logistics monitoring and
control system
Smooth Handling of approx. 45 MTPA of coal annually by APL
resulting in lower inventory requirement
Constitutes 6.5% of total coal consumption for thermal power
plants in India
All projects have excellent infrastructure facility for faster handling of
rakes. Some Examples are as below
Tiroda
-
-
3 wagon tipplers for handling BOXN rakes,
1 track hopper for handling BOBRN rakes
- 9 lines within plant to ensure adequate rail infrastructure
Kawai
=
2 Wagon Tipplers for handling BOXN Rakes
1 Track Hopper for handling BOBRN Rakes
6 lines within plant to ensure adequate rail infrastructure
REL, Tilda
3 Wagon Tipplers for handling BOXN Rake.
4 nos truck tippler unloading facility
-
6 lines within plant to ensure adequate rail infrastructure.
Plant and Mine Locations
adani
Power
NCL
Kawai
Schars
Mundra
SECL Korba
Godda
Tilda
Dhamra
WCL Umrer
Tiroda
SECL Korea Rewa
MCL Talcher
Raigarh
MCL IB
REGL, Raigarh
Due to proximity of coal mines, Coal is transported through Road/RCR
mode with 2 nos truck tipplers. Railway system under commission.
Map not to scale. For illustration purposes only, BOBRN - Bogie Open Bottom Rapid with pNeumatic door opening actuators,
WCL - Western Coalfields Limited, SCCL - Singareni Collieries Company Limited, SECL - South Eastern Coalfields Limited,
MCL Mahanadi Coalfields Limited, NCL - Northern Coalfields Limited
Udupi
Mangalore scCL
APL Plants
Mines
Port for Imported Coal
PPA counterparty
states for APL
17View entire presentation