In March 2018 road tanker LNG loading terminal
(located inside the PERU LNG plant) was given
its final permits by Osinergmin enabling it to start
operating, ending the previous trial period for tanker
loading. Commercial operations began on the 9th
of July 2018, in compliance with the contractual
requirements for official inauguration.
The road tanker LNG loading terminal includes a
control centre, depressurisation station, pipelines
bringing gas from the plant, safety mechanisms,
electrical and control systems, communications and
closed circuit television, among others.
From then on the loading terminal has guaranteed
the supply of LNG by road to regasifying stations in
the north and south west of the country. Delivery
is in the hands of the distributor Shell LNG and its
concessionaires: Quavii, which supplies the cities
of Cajamarca, Lambayeque, Chiclayo, Pacasmayo,
Trujillo, Chimbote and Huaraz in northern Peru,
and Petroperu, which supplies the South: Arequipa,
Moquegua, llo and Tacna.
The southern concessionaire changed in 2020, with
Naturgy operating until the 18th December 2020
before being replaced by Petroperu, which started
operations on the 19th of December that same year.
Furthermore, since December 2020 a new client,
Lima Gas, has been responsible for LNG supplies
in the Cusco region and had taken 60 loads by the
end of 2021. Finally, in June 2021 Calidda became a
temporary client of the terminal and loaded 3 tankers
during the year.
During 2021, 3 862 (three thousand eight hundred
and sixty two) tankers were dispatched, equivalent
to 4 407 829 MMBtu (4.41 TBtu).
TRUCKS LOADED IN 2021
INFRASTRUCTURE
CHAPTER 5
UND THE
2700
2688
2400
2400
2100
1800
1500
1200
1111
900
600
300
0
60
60
3
Quavii
Petroperu
Limagas
Calidda
32View entire presentation