Investor Presentaiton slide image

Investor Presentaiton

NECHAKO GOLD PROJECT PAST - Ice sheet scrapes over deposit Deposit Ice Surface Tower Resources Ltd - TSX-V: TWR 9 PRESENT - Resulting overburden contains sulphide grains in a dispersal train. RC sampling used to collect samples. Deposit Bedrock Reverse Circulation drill rig collecting Nechako till samples; bedrock was also sampled 0.25 mm Overburden Surface 茶 Sulphide dispersal train Bedrock Heavy Metal Concentrates (HMC) produced from till samples in lab to target diamond drilling. HMC NRC-17-25-05 grading: 0.8 g/t Au, 16.0g /t Ag, 0.2% Cu, 0.1% Pb, 0.3% Zn
View entire presentation