Investor Presentaiton
Exploration Updates
During 1H 2021, the Company continued to intensify its exploration activities, both in the Eastern and Western Corridor, in
order to accelerate the finding of new Mineral Resources and Ore Reserves.
Toka Tindung Gold Mine's deposits are classified as low sulphidation epithermal gold and
silver deposits, with more "free" or native gold and better gold recovery rates compared to
other types of deposits.
During 1H 2021, Archi predominately mined Toka Pit (a large tonnage lower grade deposit)
and the Kopra Pit (medium grade). In addition, completed mining of remaining tonnage in
the high grade Araren stage 3 Pit, whilst developing a new mining area at the Alaskar Pit.
1 In Araren stage 5 Pit requires 5 months of waste mining prior to accessing high grade gold.
This pre-stripping commenced in March and will be completed by August 2021. Araren
stage 5 high grade gold will be the major source of ore to be processed in 2H 2021.
Excitement came with the continuing success from the exploration drilling in the Bima gold
deposit at Western Corridor, which is located approximately 15km west of the Toka Pit. Five
diamond drill rigs have been in operation there since September 2020 and at the time of
this announcement, they have completed 80 diamond drill holes amounting to 22,800
metres.
These drillings have returned 33 intersections above a nominal cut-off of 20 gram metres,
which represents a nominal minimum width of 4 metres at grade of 5 g/t gold.
☐ As of December 2020, the deposit in Western Corridor contained an Indicated and Inferred
Mineral Resource of 2.2 Mt at 7 g/t of gold, for a potential of 493 koz of gold produced.
These latest results, and additional drilling underway, are expected to significantly increase
the Mineral Resources for 2021.
Note:
(1) Based on Toka Tindung Gold Mine Mineral Resources and Ore Reserves Reports, prepared and verified by SRK Consulting (Australasia) Pty Ltd.
NORTH SULAWESI
Toka Tindung
Marawuwung
Blambangan
Araren
Arch
PROGRAM PEMBORAN EKSPLORASI
PADA Q2 TAHUN 2021
Kopra
Western Corridor Project
Alaskar
Legend
Drillhole Status
Compet
⚫On Progress
MGM Boundary
TTN Boundary
10
KM