Investor Presentaiton slide image

Investor Presentaiton

GRUYERE MINE OPTIMISATION GROWING A HIGH MARGIN OPERATION Gruyere Joint Venture is focused on optimising: Mining Plant Extended Indicated Resource below mine design. Geotechnical and metallurgical studies for potential pit deepening in progress Process plant (SAG mill) configured for fresh ore. Capability to be determined over next ~6 months. SAG mill confirmed as main throughput constraint Powerhouse upgrade. Additional gas power generation augmented by solar and battery (studies underway) S 50,000 mN December 2019 End December 2019 OR Stage 5 Design - A$1,600 Open Pit Survey -9,400 mRL -9.200 2018 Indicated boundary: OR constrained -9.000 2019 Indicated boundary: -8.800 -8,600 mRL -8,400 mRL available for OR evaluation GOLD ROAD 15GY0107 164 m at 1.60 g/t Au RESOURCES GRUYERE JOINT VENTURE Gruyere Gold Deposit South to North Long Projection. GOLD ROAD RESOURCES Note: Refer to ASX announcement dated 9 September 2019, 12 February 2020 and 24 July 2020 51,000 mN December 2019 N MR Pit Shell - A$1,850 Northern Fault 500m Cover Oxide Saprock & Transition Fresh Rock 19GY0365 41 m at 2.52 g/t Au 19GY0366 42 m at 1.40 g/t Au Resource Category Measured Indicated Inferred Unclassified MR Mineral Resource OR Ore Reserve PAGE | 14
View entire presentation