Investor Presentaiton slide image

Investor Presentaiton

Raigarh Energy Generation Limited Asset Details Capacity (MW) Acquired from Technology Location State Status COD PPA Fuel Supply Agreement Coal Transportation 600 MW (1 unit of 600 MW) Lenders under IBC debt resolution process (NCLT) Sub critical Chhattisgarh Fully operational since Feb 2015, Due to generator failure in May 2017, plant was shut down pending repair by BHEL Apr 2014 Variable cost PPA with Chhattisgarh State Power Trading Co. to sell 5% of power Allotted 3 year MT PPAs of 185 MW with Tamil Nadu and 110 MW with Telangana Plans to secure LT PPA for plant through Case 1 bids post restart of operations Total coal requirement of -2.46 MTPA for LT PPA and CG PPA FSA with MCL (2.315 MTPA) for LT PPAS Balance coal to be procured through auction route Construction of railway line from Bhupdeopur stn. to site is under progress Rail line construction expected to be completed in 10-12 months post taking over operations Coal currently transported by road from rail station to site over a distance of 29 km Evacuation Arrangement 20 km double circuit 400 kV transmission line upto PGCIL substation at Kotra Plant Location Plant location: Near Villages Chote Bhandar, Bade Bhandar, Sarvani Amali Bhona & District Chhattisgarh Raigarh, adani Power 47
View entire presentation