Investor Presentaiton slide image

Investor Presentaiton

TB Copper/Gold Project Latest Drill Results UHGZ Drilling Results to Date Hole ID From (m) To (m) Interval (m) Cu (%) Au (g/t) UHGZ-19-001 556 1,308 (EOH) 752 0.46 0,50 • including 724 904 180 0.63 0.62 including 1,086 1,308 222 0.69 0.91 UHGZ-19-002A 523 1,058 (EOH) 534 0.54 0.95 including 642 770 128 0.89 1.93 including 824 1,016 192 0.58 1.05 UHGZ-19-003 384 732 (EOH) 347.6 1.40 1.40 including 438 666 228 1.71 1.97 MERDEKA COPPER GOLD Comments 13 holes drilled; table shows results for first 3 holes First assays have shown higher than expected grades when compared to the 2012 inferred resource Intercepts above the 0.2% Cu cut-off have been longer than expected 11
View entire presentation