AUSTRALIA'S ENERGY MARKET IS IN TRANSITION
The Australian Energy Market Operator's (AEMO) 2020 Integrated System Plan (ISP) was released in July 2020 and identifies nationally
significant and essential investments in the electricity system and outlines the forecast installed capacity requirements for generation
Networks are critical enablers of the market's transition
Key market requirements in the 2020 ISP(1)
Around 18 transmission projects including 10 in NSW,
representing direct opportunities for TransGrid with a combined
estimated capital cost of approximately $13bn (2)
Solar
Wind
PV
Distribution
Behind-the-meter (Distributed energy resource, DER)
Battery
storage
EV
Hydrogen
.
.
.
Targeted grid investment needed to balance resources across
States and unlock Renewable Energy Zones (REZS)
Over 26 GW of new grid-scale renewables is needed to replace
approximately 15 GW or 63% of Australia's coal-fired generation
by 2040
6-19 GW of new dispatchable resources are needed in support
to firm up the inherently variable nature of distributed and large-
scale renewable generation
Rooftop solar expected to more than double (to ~25 GW),
supplying up to 22% of total energy by 2040
(1) Optimal development path
(2) AEMO's modelled cost estimates in the 2020 ISP
Spark Infrastructure I Investor Presentation I August 2020
000
Pumped
ā Hydro
Grid-scale
battery
Transmission
Hydro
Large industrial Commercial and
loads
domestic loads
Thermal
generation
ttt
Transmission
Source: AEMO, 2020 Integrated System Plan
Distribution