Endeavour Mining Investor Presentation Deck
KEY OPPORTUNITIES
●
●
●
WAHGNION MINE
Burkina Faso
Greater mining flexibility following the commissioning of
the Samovogo satellite deposits later this year
Pit optimisation and sequencing following incorporation of new
discoveries
Continual reduction in expatriates and development of local talent
following the successful project ramp-up
PRODUC ON AND AI
Mining fleet optimisation and increased owner mining to increase
mining rates and optimise surface haulage from Samovogo
$950/oz
47koz
2019A¹
175koz
MINING
$898/oz
2020A
AISC ($/oz)
147koz
$995/oz
HAK
2021A
Production (koz)
COO video presentation
140-150koz
$1,050
1,150/oz
ENDEAVOUR (1) Commercial production declared November 1, 2019
2022E
O
RESERVES AND RESOURCES AS AT DEC. 31, 2021
Resources shown
inclusive of Reserves (on a 100% basis)
Proven Reserves
Probable Reserves
P&P Reserves
Website
Measured Resource (incl. reserves)
Indicated Resources (incl. reserves)
M&I Resources (incl. reserves)
Inferred Resources
2021 EMISSIONS INTENSITY²
kgCO2eq/oz produced
Wahgnion
Endeavour
Industry
Average²
540
690
Latest technical report
900
Tonnage
(Mt)
2.1
19.5
21.6
2.3
38.4
40.7
5.0
kgCO2eq/t processed
Wahgnion
Endeavour
Grade
(Au g/t)
0.78
1.60
1.52
0.82
1.52
1.48
1.53
Industry average
(open pit)³
(2) 2020 and 2021 weighted average GHG emissions intensity (Scope 1 & 2). S&P Global, Company Filings (3) 2019 industry average, S&P Global, Company Filings
3D mine site tour
Content
(Au koz)
52
1,006
1.059
60
1,879
1,940
247
25
34
32
81View entire presentation