Accomplishments and Progress: Summary of FY23 • All design work and safety evaluations completed • All equipment delivered • • All infrastructure built and commissioned - - - Electrical (13.2kVAC, 480VAC, 220/120VAC, 24VDC controls) Compressed air Integrated thermal management system - Deionized water storage, polishing, and delivery system All sub-systems integrated - - - Electrolyzer (including chiller and HVAC sub-systems) Hydrogen compressor Gas management panel Ground storage tanks - Fuel cell generator (excepting electrical which is partially complete) Site electrical power commissioned, including auxiliary sub-systems NREL 16