Community Solar Deployment and Subscriptions slide image

Community Solar Deployment and Subscriptions

Cumulative MWac 800 Minnesota's Market is Making a Strong Comeback in 2023 Community Solar Capacity Installed in Minnesota (MWac) Operational Planned 400 513 668 795 841 875 924 317 200 266 Minnesota's installed capacity is ramping up in 2023 H1 Cumulative installed capacity increased from 795 MWac in 2020 to 875 MWac in 2022, representing a total addition of 85 MWac over two years. By H1 2023, the cumulative installed capacity had reached 924 MWac, with an additional 49 MWac added in the first six months of the year. Community solar deployment in Xcel Energy's service territory contributed to the majority of the deployment in Minnesota. As of 2023 H1, projects in Xcel Energy's territory totaled: 917 MWac in operation. 317 MWac planned. 2017 2018 2019 2020 2021 2022 2023-H1 Planned Data Source: 2016-2022: Sharing the Sun Project List 2022; Planned*: Xcel Compliance Filling Monthly Update, DOCKET No. 13-867, and Xcel Interconnection Monthly Update. The "planned" status includes in construction, in study analysis and in application stage. The darker blue represents the cumulative installed rated AC power output (MW) for community solar in operation by the corresponding year in Minnesota. The light blue represents the capacity planned to be installed in 2023 H1 and thereafter. NREL 21
View entire presentation