EVE SPAC Presentation Deck slide image

EVE SPAC Presentation Deck

Timeline to Achieve Entry Into Service 2017 - 2020 2021 2022 Market Analysis | Initial Concept and Trade Studies | Mock-Ups | Flight Simulator T Subscale Testing | Full-Scale PoCs | Concept of Operations (CONOPS) Simulations Final Product Concept Proven Development Approach Employing the development model evolved by Embraer over 50+ years, enabling consistent completion of programs on-time, on-spec and under budget Balanced and deterministic approach incorporates agile, model-based engineering techniques and iterative use of testing environments and PoCs ● 2023 2024 - Type Certification Campaign Final Design 2025 2026 Type Entry Into Certification Service Ground and Flight Test Campaigns T Manufacturing Facilities | Initial Production Note: Timeline is based on management estimates. Figures are illustrative and subject to material change. PoCs = proofs of concept. Prep Ops = preparation for customer operations. ANAC = Agência Nacional de Aviação Civil. FAA = Federal Aviation Administration. EASA = European Union Aviation Safety Agency. Prep Ops Proven Certification Approach Engaging with ANAC in Brazil as the primary certification authority, with a bilateral agreement with the FAA and follow-on certification from EASA Approach leverages Embraer's success with triple type certifications and long- standing relationships with all global regulatory authorities 14
View entire presentation