Fresnillo Results Presentation Deck
SAN JULIÁN
●
●
●
●
●
CIÉNEGA
Operationally in-line with expectations
Labour reform impacted development rates and equipment availability in 2H21
Lower volume of ore processed impacted by an electrical outage during the year
●
2021 PRELIMINARY RESULTS - OPERATIONS
OTHER OPERATIONS
●
HERRADURA
Strong operational performance
As the scope of the Carbon in Column project increased, construction will now be finished in
mid 2022
Concluded the conversion of our haulage fleet to the dual fuel system
●
Strong operational performance
Higher than expected ore grade at the DOB
Operational continuity of the DOB mine was maintained, with no geotechnical issues
detected
Lower volume of ore processed driven by two electricity outages during the year
●
NOCHE BUENA
The mine closure plan commenced, with ore extraction from the pit expected to end mid-
2022