Vale ESG Presentation Deck
Understanding the TDMS¹
HIRA² deliverables
1 FMEA³, MUE4, Risk Assessment, Controls
Coses
Best
O
OF
D
Fe
de fe
Root Case
what
er
mig af
-
De
how
e mended. fide puti
G
BA
Awe
W
L
w
m
2
Vie
A
Rick A
"
4
2 Critical Controle One Pagers
he
Fa
far
h
S
3
w
A
And
A
A
M
2
4
4
Hum
4
www
Catal
DOM
w
10
me
me
M
YONE
depth Fi
YAR
N
3 Risk Matrix
Severity
Very Critical
Critical
Severe
Moderate
Low
Very Low
Total
4
5
Very Remote
6
12
7
5
4 Action List
Action Description
No.
3
23
Remote
18
13
4
2
0
40
Unlikely
17
2
0
28
Conduct Hydrogeology Study: Determine the cause of the high heads in the left
abutment. The local hydrogeology is not well understood.
Interim Risk Controls: Implement the following interim risk controls until the
hydrogeology study can be completed.
inverted fiter
A.
of the toe of the dam.
B. Install pressure relief wells in the left abutment to reduce artesian heads.
C. Beach tailings U/S of the dam to reduce the gradients from the reservoir.
D. Reduce the normal operating water level in the reservoir.
E. Update HIRA, critical controls, TARPS etc, as necessary.
Likely
Downstream Slope Surface Drainage: Evaluate the erosion damage that could
occur during the 1:1.000 and 1:10,000 yr floods. Dedesign the drainage system if
damage is unacceptable.
1
1
Active/Inactive Fault Verification: Determine if the fault in the bottom of the valley
where the dam is located is active or not.
0
Conduct the following Additional Slope Stability Analyses:
A. Effective stress analysis with cohesion intercept equal to 0. i.e. c'= 0 kPa.
B. Undrained analysis using pseudostatic analysis
C. Deformation study.
D. Evaluate and update the critical sections (CC2), instrumentation (OMS) and TARPs
(OMS) as appropriate.
0
Calculate Earthquake Induced Settlement of Colluvium Layer
Install Additional Information: Install vibrating wire piezometers in existing standpipe
piezometers to obtain real-time piezometric data for dam.
Very Likely
0
0
0
0
0
0
Reason/Origin
Elevated Risk due to adverse
conditions
Interim Risk Reduction
Improve risk understanding
Improve risk understanding
Risk Reduction
Improve risk understanding
Improve risk understanding
CULTURAL TRANSFORMATION AND KEY BEHAVIORS
POLICIES & COMMITMENTS
TECHNICAL: Normative Standards and Procedures
ORGANIZATIONAL: Roles, Responsibilities and Authorities
TECHNOLOGICAL: Systems and Technologies
Performance
Routine
Total
49
26
9
5
5
1
95
Timeline
30-Aug-22
31-Dec-21
31-Dec-22
31-Dec-21
30-Nov-22
30-Jun-21
31-Dec-21
1 TDMS stands for Tailings and Dam Management System. 2 HIRA stands for Hazard Identification and Risk Assessment. 2 FMEA stands for Failure Mode and Effect Analysis. 4 MUA stands for Material
Unwanted Event.
Risk