Fresnillo Results Presentation Deck
2022 PRELIMINARY RESULTS - PROJECTS
STRONG PROJECTS FOR THE FUTURE - ORISYVO, RODEO & GUANAJUATO
ORISYVO (GOLD)
Good progress towards pre-feasibility
with several PFS level studies advancing
as scheduled, together with additional
land acquisition and a strengthened
community engagement plan
Expected avg. annual gold production:
140 165 koz
Resources of 9.6 moz Au, 13 moz Ag
RODEO (GOLD)
We have strengthened a region-wide
community relations programme and
advanced negotiations with private
landowners
●
●
Metallurgical, hydrological,
infrastructure, environmental and social
studies are underway
Expected avg. annual gold production
of 130-150 koz
Resources of 1.3 moz Au, 14 moz Ag,
with potential for further growth
GUANAJUATO (SILVER / GOLD)
66,589 metres of core drilling completed
Exploration drilling was intensified at
several targets of the District with good
results, both in vein and in bulk-mineable
lower grade ore bodies
A significant increase in both indicated
and inferred gold and silver resources
was achieved at several veins in the
district
Resources of 2.2 moz Au, 152 moz Ag,
with potential for further growth
20
TAJITOS (GOLD)
Claim consolidation and land purchase
were completed
●
Core and reverse circulation drilling
resumed, aiming to fully delineate the ore
bodies by 2Q 2023
19,536 metres of core and reverse
circulation drilling have been carried out
so far
Resources of 1.1 moz Au, with potential
for further growthView entire presentation