AngloAmerican Results Presentation Deck
Technology & innovation will transform the physical
footprint of mining
$0.1-0.3bn¹ pa capex to support FutureSmart MiningTM & the delivery of our Sustainable Mining Plan targets
Initiative
Application
Progress
Los Bronces (Copper) Confluencia Plant (~65% of complex feed) unit operational with workplans under way to
support business as usual. Currently, units are being impacted by feed constraints
Barro Alto (Nickel) in-pit upgraded unit commenced operation in Q2 2023 and currently ramping up to achieve
upgrade potential.
Planning for trials at Kolomela (Iron Ore) under way
Bulk ore sorting
Coarse particle
recovery (CPR)
Hydraulic
dewatered stacking
(HDS)
Zero Emissions
Haulage Solution
(ZEHS)
Copper
& Nickel
Anglo American
Copper, PGMs
& Iron Ore
Copper
& PGMs
Portfolio-wide
Impact
Deliver improved feed grade to plants through
early rejection of waste, resulting in energy,
water and cost savings
Innovative flotation process allows material to
be ground to a larger particle size, rejecting
coarse gangue and allowing water to release
from coarser ore particles, improving energy
efficiencies and water savings
Engineering of geotechnically stable tailings
facilities that dry out in weeks, facilitating up to
85% water recovery
Through First Mode, developing hydrogen-
powered ultra-class mining haul trucks to
decarbonise our largest source of diesel
consumption, through renewable energy
.
.
.
El Soldado (Copper) CPR unit in operation
Constructing full scale system at Mogalakwena North Concentrator (PGMs) - slurry commissioning completed
and in the ramp-up and optimisation phase. Expected to deliver productivity benefits in H2 2023
CPR approved at Quellaveco (Copper) to treat flotation tails, improving recoveries by ~3% over the LOA.
Commissioning expected in late 2023
Feasibility work continues at Los Bronces (Copper) & Minas-Rio (Iron Ore). Options being investigated at
Collahuasi (Copper)
El Soldado (Copper) - the trial is still on-going and expected to continue to Q2 2024. Phase 1 is complete, and
results are encouraging with ~80% water recovery and rapid consolidation
Assessing application to tailings expansion at Mogalakwena (PGMs) with benefits from water quality and
quantity improvements. Brownfield trial started in Q2 2023, after learnings from El Soldado trial
ZEHS hydrogen-powered hybrid mine haul truck at Mogalakwena (PGMs) successfully completed its prototype
testing phase, accessing the deepest parts of the mine and hauling 300t loads
Truck development continues with second generation powerplant, refuelling systems and infrastructure to be
built and tested
In January 2023, completed the transaction to combine First Mode and Anglo American's nuGenTM ZEHS, to
accelerate the transition of mining and other heavy industries towards zero emissions
1. Technology and innovation capex is estimated to be between $0.1-0.3bn pa (previously $0.2-0.5bn pa), including capex on Zero Emissions Haulage Solution (ZEHS) programmes and the lower guidance reflects equity accounting of the SA Regional Renewable
Energy Ecosystem joint venture, Envusa Energy.