★ SABODALA-MASSAWA MINE Senegal Overview MINING Quick Facts Timeline ENDEAVOUR 360-375koz 2022 Target Production The Sabodala-Massawa complex has potential to become a top tier asset with long mine life, high grade, low cost and significant exploration potential. Ownership Existing and well-established infrastructure at Sabodala, having produced +2Moz in the last decade, to be upgraded and optimised for Massawa integration. 90% EDV 10% Senegal 2010 $675-725/oz 2022 Target Teranga Gold acquired Sabodala gold mine 2009 First gold poured AISC Mining Type Open pit / Owner Mining Underground potential 2012 2016 COO video presentation Processing Rate Construction of the Sabodala-Massawa expansion is planned to begin in Q2-2022 with first production from the new 1.2Mtpa BIOX® plant expected in early 2024. 4.4Moz As at December 31, 2021 P&P Reserves EDV expects incremental production of 1.35Moz at a low AISC of $576/oz over the life of the BIOX® Expansion Project 4.0Mtpa CIL plant 1.2Mtpa for refractory ore treatment (ROT) to be constructed First mill expansion completed, doubling milling capacity (2-4Mtpa) O Completed second mill expansion, increasing capacity to 4.3-4.5Mtpa 2020 Website Royalty 5% 2020 In March 2020, Teranga acquired the neighboring Massawa project from Barrick Latest technical report 2022 E 6.9Moz As at December 31, 2021 M&I Resources SENEGAL Sabodala- Massawa Mine Corporate Tax 25% In August 2020, Teranga published the PFS for the Sabodala-Massawa project BIOX® expansion project construction launched 46
View entire presentation