Fresnillo Results Presentation Deck
2021 PRELIMINARY RESULTS
SAUCITO
2021 SUMMARY
Labour reform impacted development
rates and equipment availability in 2H21
●
●
Increased seismicity in the Jarillas vein
limited access to higher ore grade
areas, requiring additional development
to recapture operational flexibility
• The deepening of the shaft advanced,
though at a slower than expected pace
*Includes production from Phase I of the Pyrites Plant
**As of 31 May 2021
2022 PRIORITIES
Maintain strict safety protocols
Mitigate the impact of the labour reform
Target a return to an average development
rate of more than 3,000 metres a month
Continue the implementation of projects to
improve infrastructure including the
deepening of the Jarillas shaft, ventilation and
pumping infrastructure
●
●
OPERATIONS
●
• Increase volumes of ore processed to
nameplate capacity towards 4Q22
Complete third-party review of full planning
cycle (short, mid and long term)
Production
Million Ounces
20
15
LO
5
0
|||
2019
2018
KEY OPERATING HIGHLIGHTS
Silver production* - moz
Gold production* - koz
Cash cost - US$/oz of Ag
AISC - US$/oz of Ag
Reserves 2021 **
Resources 2021 **
Silver grade in reserve
2020*
Silver Production
Silver Ore Grade
Production guidance range
H
2021*
2021
13.0
90.7
(0.79)
9.5
2022e*
350
300
250
200
150
100
39
Grade
Grams/tonne
2020
16.5
88.3
0.76
6.9
124.9 moz Ag, 586 koz Au
505.3 moz Ag, 2,182 koz Au
219 g/t
303 g/tView entire presentation