Fresnillo Results Presentation Deck slide image

Fresnillo Results Presentation Deck

2021 PRELIMINARY RESULTS SAUCITO 2021 SUMMARY Labour reform impacted development rates and equipment availability in 2H21 ● ● Increased seismicity in the Jarillas vein limited access to higher ore grade areas, requiring additional development to recapture operational flexibility • The deepening of the shaft advanced, though at a slower than expected pace *Includes production from Phase I of the Pyrites Plant **As of 31 May 2021 2022 PRIORITIES Maintain strict safety protocols Mitigate the impact of the labour reform Target a return to an average development rate of more than 3,000 metres a month Continue the implementation of projects to improve infrastructure including the deepening of the Jarillas shaft, ventilation and pumping infrastructure ● ● OPERATIONS ● • Increase volumes of ore processed to nameplate capacity towards 4Q22 Complete third-party review of full planning cycle (short, mid and long term) Production Million Ounces 20 15 LO 5 0 ||| 2019 2018 KEY OPERATING HIGHLIGHTS Silver production* - moz Gold production* - koz Cash cost - US$/oz of Ag AISC - US$/oz of Ag Reserves 2021 ** Resources 2021 ** Silver grade in reserve 2020* Silver Production Silver Ore Grade Production guidance range H 2021* 2021 13.0 90.7 (0.79) 9.5 2022e* 350 300 250 200 150 100 39 Grade Grams/tonne 2020 16.5 88.3 0.76 6.9 124.9 moz Ag, 586 koz Au 505.3 moz Ag, 2,182 koz Au 219 g/t 303 g/t
View entire presentation