Endeavour Mining Investor Presentation Deck slide image

Endeavour Mining Investor Presentation Deck

FETEKRO PROJECT DFS expected to be published mid-2022 INSIGHTS > Since the last resource update on 18 August 2020, more than 66,000 meters of drilling have been completed on the Lafigué deposit, the results of this drilling activity successfully demonstrated the overall continuity of the mineralised system with the occurrence of shallow, subparallel, and stacked mineralised lenses that were previously located outside of the 2020 resources pit shell. The Indicated resource estimate has grown by 445koz to 2.9Moz. > > Given the increase in Indicated resources and the strong additional exploration potential, Endeavour has decided to increase the envisaged nameplate throughput capacity of the plant by 33% to 4Mtpa in the DFS, which is expected to be published in late Q2-2022. Fetekro mining permit was granted in September 2021. > In the near-term, the Lafigué deposit remains the priority at Fetekro, while the longer-term focus is on delineating several identified targets on the property. Drilling between Lafigué Center and Lafigué North LFRC21-1276 5.8m @3.18 g/t Au 3.9m @ 9.70 g/t Au incl. 1.0m @33.70 g/t Au LFRC21-1297 "2.8m @ 12:34 g/l Au incl. 0.9m @17.02 g/t Au incl. [email protected] g/t Au 3.8m @ 29.74 g/t Au incl. [email protected] gt Au LFRC21-1277 [email protected] gft Au 6.8m @ 0.96 g/t Au [email protected] g/l Au incl. 0.9m @33.80 g/t Au LFRC21-1314 [email protected] g/t Au Incl. [email protected] gt Au incl. [email protected] g/l Au [email protected] g/t Au LFRC21-1298 10.4m @6.63 g/t Au incl. 0.9m @26.08 g/t Au Incl., 0.9m @11.86 git Au Incl. 0.9m @23.87 g/t Au 1.9m @ 7.19 git Au incl. 0.9m @ 13.49 g/t Au LFRC21-1300 [email protected] g/t Au incl. [email protected] g/t Au 1.9m @21.71 g/t Au incl. 0.9m @6.82 g/t Au Incl. 0.9m @36.60 g/t Au LFRC21-1301 [email protected] g/t Au incl. 0.9m @14.49 g/l Au LFRC21-1322 [email protected] g/t Au incl. 1.0m @ 38.10.g.t Au Incl. 1.0m @27.42 g/t Au 1.9m @12.73 g/t Au Incl. 1.0m @23.85 g/t Au LFRC21-1335 3.9m @ 12.77 git Au incl. 1.0m @ 39.20 git Au LFRC21-1307 9.7m @ 4.04 git Au incl. 1:0m @ 13.55 g/t Au LFRC21-1233 -6.6m @ 6.42 g/t Au incl. 0.9m @ 23.90 g/t Au incl. 0.9m @ 13.01 g/t Au [email protected] g/t Au 2.8m@ 1.48 g/t Au A O 19 LFRC21-1336 3.9m @ 7.28 g/t Au incl. 1.0m @27.36 g/t Au 250 metres 19 Q LFRC21-1234 3.9m @ 14.61 g/t Au incl. 1.0m @ 56.40 g/t Au 500 KOO LFRC21-1340 3.8m @ 6.31 g/t Au incl. 0.9m @22.82 git Au Α’ LFRC21-1325 12.5m @ 9.14 g/t Au incl. 1.0m @ 25.67 git Au incl. 1.0m @ 12.88 git Au incl. 1.0m @ 29.49 git Au incl. 1.0m @ 11.94 g/t Au incl. 1.0m @ 17.08 git Au 2.9m @ 4.84 g/t Au 2.9m @ 2.22 g't Au ENDEAVOUR MINING LFRC21-1345 8.6m@ 2.55 g/t Au incl.-1.0m @ 12.75 g/t'Au LFRC21-1363. 164 m @2.16 g/t Au incl. 1.0m @11.97 git Au LFRCDD20-1026 7.7m @ 6.47 git Au incl. 1.0m @ 42.50 git Au 1.9m @2.67 git Au LFRC21-1331 7.7m @ 5.49 git Au incl. 1.0m @ 32.00 g/t au [email protected] g/t Au [email protected] g/t 'Au Incl. 1.0m @ 55.80 g/t Au LFRC21-1271 @ [email protected] git Au LFRCDD21-1272 [email protected] git Au incl. 0.9m @ 24.23 g/t Au incl. 0.9m @ 13.97 git Au incl. 0.9m @23.49 git Au 5.6m @ 0.91 git Au Drilling Prior to Nov. 2020 Drilling From Nov. 2020 With Results Drilling From Nov. 2020 With Partial Results Drilling From Nov. 2020 With Pending Results Mineralization at Surface July 2020 Pit Shell Felsic Volcanics Granodiorite/Microdiorite Intermediate to Mafic Volcanics Mafic Intrusive Silicified Volcanics 101
View entire presentation