Adani Green Energy Limited
Development Pipeline: Key Differentiating Factor for AGEL
adani
Renewables
5.3 GW Contracted
(2.3 GW Operational
+ 2.9GW under-
construction)
+
-5 GW Wind Sites
under development
-9 GW Solar sites
under development
-20 GW sites
under operation/ development
Expected Wind growth is supported by
7
-5 GW of wind sites under self development
Land applied for 75% of identified area.
Transmission Connectivity available for 1.8 GW
41 wind masts installed across multiple sites in India
Use of leading turbine technologies to drive down the LCOE
Expected Solar growth is supported by
-9 GW of solar sites under self development
Land applied for 95% of the identified area
-
Transmission connectivity approval available for ~ 2.4 GW
- Ready sites to
house future
projects
- Large scale sites
enable large
single location
project to be
developed in
multiple phases
LCOE Levelized Cost of Energy
AGEL ideally positioned to win a significant portion of live and future bids
26View entire presentation