Adani Green Energy Limited slide image

Adani Green Energy Limited

Development Pipeline: Key Differentiating Factor for AGEL adani Renewables 5.3 GW Contracted (2.3 GW Operational + 2.9GW under- construction) + -5 GW Wind Sites under development -9 GW Solar sites under development -20 GW sites under operation/ development Expected Wind growth is supported by 7 -5 GW of wind sites under self development Land applied for 75% of identified area. Transmission Connectivity available for 1.8 GW 41 wind masts installed across multiple sites in India Use of leading turbine technologies to drive down the LCOE Expected Solar growth is supported by -9 GW of solar sites under self development Land applied for 95% of the identified area - Transmission connectivity approval available for ~ 2.4 GW - Ready sites to house future projects - Large scale sites enable large single location project to be developed in multiple phases LCOE Levelized Cost of Energy AGEL ideally positioned to win a significant portion of live and future bids 26