Fresnillo Results Presentation Deck slide image

Fresnillo Results Presentation Deck

2022 PRELIMINARY RESULTS OPERATIONS OTHER OPERATIONS SAN JULIÁN Silver production at San Julián veins saw a higher ore grade due to the prioritisation of extraction from wider veins of the mine with higher silver content but lower gold ore grade Exploration continued in the area, increasing silver resources at San Julián veins and DOB Construction of the third phase of the tailings dam commenced CIÉNEGA 146 • Ongoing workforce rotation, together with lower equipment availability from contractors, continued impacting productivity 87,503 metres drilled during the year, although higher costs and cut off grades resulted in a decrease in silver and gold resources by 10.8% and 14.3% respectively Mo Construction of the second stage of the third tailings dam commenced 15 HERRADURA As the scope of the Carbon in Column project was increased to improve its efficiency, construction will be completed in mid-2023 The pit slope optimisation study was concluded and recommendations are being tested in different geotechnical domains of the pit echnical Construction of the 14th phase B leaching pad was concluded ● NOCHE BUENA Additional mineralisation was found through the condemnation drilling and mining was extended for a few additional months Productivity increased due to the increase in tonnes hauled shorter distances by a reduced number of employees The mine closure plan underway
View entire presentation