Vale Results Presentation Deck slide image

Vale Results Presentation Deck

Vale's Performance in 2022: We are building a better Vale Upstream dams in Brazil: 40% eliminated by 2022E Baixo João Pereira dam and Dike 4¹: decharacterization concluded Backup dam for Coqueirinho completed B3/B4: 40% tailings removed, and conclusion anticipated to 2025² 9 structures eliminated since 2019 Eliminated upstream structures in Brazil Unit per year 7 5 532 2 40% 4 2 60% 2 2 5 Concluded 3 30 2019-21 2022E 2024E 2025E² 2026E² 2027E 2029E 2035E Total ¹ Dike 4 decharacterization was completed and final works in the site will continue along the second half of this year. 2 Due to the need to implement instruments, drilling and complementary engineering studies, the date of Campo Grande de-characterization conclusion changed from 2025 to 2026. Despite the change in the Campo Grande dam de-characterization deadline, the company maintains the commitment to de-characterize 18 structures of the program by 2025 due to the tendency to anticipate the completion of the B3/B4 dam works. VALE
View entire presentation