H₂ STATION ROLL-OUT
DEDICATED SINGLE-STATION STRATEGY
HYDROGEN STATION ROLL-OUT STRATEGY
Hydrogen fueling stations will be built one at a
time along dedicated routes, based on customer
need and network optimization
•
• "450,000 trucks, or "25% of total fleets(2),
operate along dedicated routes, typically
between a plant and distribution center along
major freight corridors
• Initial build out of 1,200 station equivalents)
will be developed to serve this section of the
market (based on 210 trucks per 8,000kg station)
• Station locations determined by pre-orders,
selecting customers with routes along the most
trafficked freight corridors
. First stations may potentially operate as hubs,
allowing fleets to refuel within a 250-mile radius
• Projected average one-time station capex of
$16.6M expected to support 630 leases over 21
years improvements in technology are
expected to reduce capex by 10% in 2025 and
beyond
Targeting dedicated routes segment enables a
focused roll out of H₂ station network to optimally
manage capital outlay
PROJECTED TOTAL STATION CAPEX
One Time Station Related Capex
Station Production and Fueling Equipment
Land and Building
Total Station CapEx
210 Trucks x 3 Product Cycles
Total Station Capex per 7-year Truck Lease
Key Hydrogen Station Components
NEL A-485 electrolyzer 50MPa Hydrogen
1,000kg/day 2.2MW Storage
$
1 Includes transformer/rectifier, electrolyzers, supply compressors, hydrogen storage, fuelling station equipment, dispensers and installation
2. Management industry source estimate
3. Equivalent of 1,200 stations producing 8,000kg: actual number of locations will likely vary as some stations will produce >8,000kgs
14,860,000
1,750,000
16,610,000
630
26,365
Dual H₂Station® Fueling
1,000kg/day two
dispensers