Lordstown Motors Investor Presentation Deck
Clear Path to be First to Market
Modest Engineering and Retooling Needed to Begin Production
Based on the Excellent Condition of the Plant and Equipment at the Lordstown Complex, LMC Projects ~$120 Million of Investment to
Retool the Equipment for Full Production Readiness
Stamping
New soft tooling for three
presses is required for
production
The remaining four presses
could be removed and sold
at auction
GANS
$3M
Estimated
Investment
Body Shop
Minimal investment
required in new fixtures,
welding tools, and a truck
box robotic cell
$32M
Estimated
Investment
Source: Management estimates
Paint
Equipment is in place and
sufficient in size to
manufacture the
Endurance
Plan to convert paint line
from dry powder coating to
"wet on wet" paint process
$16M
Estimated
Investment
nas
Physical infrastructure, security, and IT infrastructure is in place and in good
working condition
Battery Packing
Reconfiguration of a
mezzanine area above final
assembly to create a
battery packing assembly
line
New robot tooling and
quality and test equipment
is required
$27M
Estimated
Investment
Lordstown Complex Infrastructure, Material Handling, and Spare Parts
$5M
Estimated
Investment
LORDSTOWN.
Hub Motor
Manufacturing
Electric in-wheel hub motor
production line will require
purchase of additional CNC
machines, tooling, and
quality and test equipment
$23M
Estimated
Investment
General Assembly
Existing state-of-the-art
Skillet conveyor system is
large enough for the
Endurance and will require
only minimal modifications
$14M
Estimated
Investment
18View entire presentation