AES Panama Investor Presentation
Electric Market Update
Installed Capacity, Mar 2021
LNG
Biogas
9%
0%
Diesel
8%
Bunker
Generation by Technology, Mar 2021
LNG
21%
Diesel
Biogas
0%
Generation by Company, Mar 2021
Others
7%
ACP
4%
Hydro
AES Pma
11%
11%
AES Chan
8%
16%
Solar
9%
Coal
5%
Wind
7%
Total Installed Capacity: 4.1GW
Hydro
46%
0%
Bunker
4%
Solar
6%
Coal
1%
Wind
9%
INTERENER
Hydro
59%
GY
9%
AES UEP
1%
GENA
0%
IDEAL
GANA
21%
3%
ENEL
MPSA
20%
Total Generation: 2.5TWh
1%
AES in Panama Market
Clear market dominance in energy generation (41%) and installed capacity (29%)
Dominant position maintained through low generation costs compared to the higher generation cost for other thermal power plants in
Panama
→>> Diversified portfolio of energy generation assets that performs well under weak and strong hydrology seasons
Diversification in geographic position of assets helps mitigate hydrology risk and any potential transmission constraints
→>
Through AES Colón, owns and operates the only power plant with a combined cycle generator and the only LNG storage tank facility in the
country
The AES Colón Plant is usually among the first three thermal generation facilities to be dispatched after hydroelectric and renewable
facilities