Endeavour Mining Investor Presentation Deck slide image

Endeavour Mining Investor Presentation Deck

Burkina Faso NABANGA PROJECT Website 3D mine site tour INSIGHTS > Located 250 kilometres southeast of Ouagadougou, the Nabanga Gold Project lies within the Nabanga exploration permit. MINING > Results of Preliminary Economic Assessment (PEA) released on September 30, 2019. Pre-tax NPV of $147m and after-tax NPV of $100m, using a 5% discount rate - LoM gold production of 571koz at AISC of $760/oz and a recovery of 92% during the eight years of operations Pre-production capital expenditure of $84m, including 20% contingency, and $56m in LoM sustaining capital > Project economics (base case of $1,300/oz gold price): After-tax 5% NPV: $100m After-tax IRR: 22.6% Payback period: 4.4 years Preferred mining method - open- pit/underground mining on the upper and at-depth portions of the ore zone, respectively Opportunities exist to improve returns through an increase in resources and additional cost saving measures ENDEAVOUR Nabanga deposit plan map and schematic cross-section Cross Section 57 1240 000 m ted Apa [email protected]/t [email protected]/t (incl. 4m @ 3.51gt) [email protected]/t [email protected]/t (incl. 2m @ 14.37git) 7m@ 17.29g/t (incl. 3m @ 35.88g/t) [email protected]/t (incl. 1.77m @26.33g/t) Southern Extension CURRENT RESOURCES as at Dec 31, 2020 25m A Nabanga North Lode Inferred Resource 3Mt at 7.69g/t Au containing 0.84Moz 88 Central Zone Sect. 57 500m North Zone Nabanga Gold Deposit (2.3km strike) Drill Hole Collars (metre grams) > 10 5 to 10 <5 A Assays Awaited Vein Trends (indicative) 107
View entire presentation