Production continuously running, supply chains being further de-risked Modules produced [MW] 321 30 2021 FY MEYER BURGER 108 2022 H1 2022 FY Ongoing production and parallel capacity expansion on track • • • • • A total of 321 MW was produced in 2022 Ramp-up of the second production line commenced in September 2022 Additional production lines (as part of the ongoing 1.4 GW expansion) are expected to eliminate bottlenecks and improve operational performance Supply chain risks are being actively managed in order to maintain continuous production and enable timely ramp-up Meyer Burger continues to de-risk its supply chain (e.g., European wafer supply contracts signed) 9