Community Solar Deployment and Subscriptions slide image

Community Solar Deployment and Subscriptions

Some States Impose System Size Maximum 21 states and the District of Columbia set a maximum size for community solar projects. • Some states have revised project caps over time. In Colorado, the amended HB 1003 (effected in 2019) increased the project size cap from 2 MW to 5 MW, and then to 10 MW after July 1, 2023. ➤In Illinois, the 2022 Procurement Plan increased the maximum project size from 2 MW to 5 MW ➤ In Maryland, HB 1039 and HB 440 (effected in 2022) increased the maximum community solar project size to 5 MW. ➤ In Minnesota, the HF 2310 (effected in 2023) expands the maximum project size from 1 MW to 5 MW. In Maine, LD 1711 (effected in 2019) lifted the capacity cap on distributed generation resources from 660 kW to 5 MW. ➤ In Delaware, SB 2 (effected in 2021) increased the maximum project size from 2 MW to 4 MW. ➤In Hawaii, capacity limits for individual projects vary by location. The largest shared renewable project cannot exceed 75 MW. NREL 14
View entire presentation