Investor Presentaiton

Made public by

sourced by PitchSend

23 of 55

Creator

PitchSend logo
PitchSend

Category

Waste Management

Published

No Date Found

Slides

Transcriptions

#1SOLID WASTE MANAGEMENT IN ARUNACHAL PRADESH By: Gyamar Tachung M/Secy.DUDA www OUR MOTTO AMENITIES PROVIDE BETTER URBAN DEPARTMENT OF URBAN DEVELOPMENT & HOUSING with special reference to the Solid Waste Management Project 1 implemented in the CAPITAL COMPLEX,ITANAGAR#2Map Of Arunachal Pradesh International Boundery Roads District Hos ADC Has H MIPIS N SDO Hars EAC Hors GELLING UPPER SIANG DIST C DIBANG VALLEY DIST TUTING MONIGONG SINGA PALLING ANINI ALINYE MIGGING MAP OF ARUNACHAL PRADESH MECHUKA PIDI YINGKIONG Source: DIPR, Naharlagun MATO-> PAYUM JENGGING MARIYANG ETALIN A KAKING UPPER SOBANS GEKU TAKSING BISY RUNGONO RIGA KATAN DARAK STUM WEST SIANG LIMONG NACHO PAYING DIS LONG BOLENG PANGING KRON MEBO CAMBUK PASIGHAT TIBET HURI (DAMIN) LONGOING KOLONG PARSI TALI TALIHA YOMCHA LOHIT ROING DESALI DIST ANELIH DANS VERLEY CHAGLAGAON KISTHOO ANJAW DIS GOLING WALLONG GIBA LIRONOBA EAST SIANGY DIST KOYU SARLI KOLORSANG PARLO DUMPORIO TIRBIN DYAN KORONU SANTIFUR CHOWKHAM TEZU HAYLILIANG MANGHAL DISTSANGRAM KURUNG KOMEY CHAMBANG DAPORIJO BASAR RUKSIN HAWAL NAMSAI WAKRO NAR SEWA NYAPIN EAST RAGA BARRIO GENSI LIKABALI LEKING PAYONG DIYUN DUMDUMA BORDUMSA MIAO KANENG DIST KONGKU TAWANG DIST LUM MUKTO SELA ZENITHANG WESTNAERA TAWANG JUNG KAMENG DIST DIRANG THRIZONO CHAYANTAJO PALIN ZIRO SUBANSI KHENOWA DIST PIPU PISTANA YACHUL SILAPATHER TINSUKIA MAKUM DIBRUGARH KHARSANG AGUN CHANGLANG DIST NAMPONG DIGBOL JAIRAMPUR VUJOYNAGAR PANGSU PASS LADA DAMING MANGIO MARGHENTA MANMAD SEPPA SUNPRA NAMTAK LAPORIAN KIMIN BHUTAN KALAKTANG BOMBILA RUPA AMR BHALUKPUNG SEUOSA CHARDUAR BALIPARA PAKKE KESANG DOIMUKH SAGACEE YANAGAR NAHARLAGUN BALOAN MPERE BISWAN CHARALI LAKHIMPUR SIBSA DEONAL CHANGLANG KHYONG Banderdewa KANUBAR DIST S JHANZ JORHAT NAMSANG KHONSA HEAP DISTAU LONGDING KA PUMAD PANCHAO MYANMAR ROWTA TEZPUR KAZIRANGA RANGIA NAGAON GUWAHATI NAGALAND#3Challenges of MSW in Arunachal Pradesh There are 30 urban census towns in Arunachal Pradesh ■These urban Towns has a floating population Ranging from 10000 to 150000 Due to Rapid Urbanization & changing of living conditions of the people, solid waste management has always been a big challenges for us. 3#4Earlier Systems of Disposal Solid waste management was an un- attended subject before 2000 in the state of Arunachal Pradesh. No Street sweepings No Collection, storage, lifting and disposal system. No identified Sanitary landfill/ dumping ground etc. 4#5Systems of Disposal since 2000 Street sweepings ■ Collection and storage in dustbins/collection points Collection & lifting from the dustbins/collection points Finally dispose off to the dumping ground but in an unscientific manner along the road side 5#6Experiences & problems being faced in Solid waste management, in Arunachal Pradesh Lack of awareness or ignorance of people ■ Stray animals ■ Lack of sewerage and proper drainage system ■ Topography & vegetations Lack of involvement of community base organizations in the region Rapid urbanization & Migration In-adequate experts personals in the field of Solid waste management. Financial constraints 6#7Focusing MSW in an organized & scientific manner Govt. of Arunachal Pradesh started given emphasis on MSW in the year 2000 onwards. ■ All District headquarters & urban towns have been provided with man power & machineries ■ Special emphasis has been given to the state capital, Itanagar & availed project from the GOI in the year 2007 under JnNURM 7#8TYPE OF WASTE GENERATED Sources of Municipal Solid Waste Domestic Waste Households Kitchen Waste House Waste Old Papers Garden Trimmings Packing Bottles Crockery Broken Furniture Institutional Waste Street Sweeping Educational Institutions Offices Shops Hospitals Hotels/ Restraunts Markets Community Halls Religious Places Paper Rotten Vegetables Organic Waste Left Over Food Flowers Packaging Material Discarded Goods Decorative Material Bandages/Infectious clothes Chemically Reactive Waste Syringes, Bandages Discarded Medicines Unconcerned Throwing Litter by Pedestrians Litter by Vehicular Traffic Paper Leaves/ Branches Rubbish from Drains Plastic Bottles Debris Broken Furniture Dead Animals Industrial Waste Manufacturing Units Processing Units Metals Ash Unused Chemicals Offal Waste Slaughter Houses Food Processing Units Vegetable Waste Rotten Food Animal Remains Biodegradable Waste Recyclable Waste Hazardous Waste Category of Waste 8#9WASTE COMPOSITION 53% 7% 6% 7% 15% 3% Paper Plastics Ash, Fines & Others Textiles and Leather ■Metals and Glass ■Compostables 6#10SOURCE OF WASTE GENERATION Source of Quantity Waste Contribution Domestic 34.35% Institutional 20.51% Commercial 28.83% Industrial 7.10% Agricultural 3.18% Natural 5.33% 10#11KEY COMPONENTS OF SOLID WASTE MANAGEMENT Generation Collection Transportation Processing Final Disposal 11#12THE APPROACH ADOPTED: INTEGRATED end-to-end solution Collection Generation Disposal 12#13MSW MANAGEMENT AT THE CAPITAL COMPLEX Interventions at each stage: 1 2 3 4 •Generation Stage .Collection Stage • Transportation Stage Disposal Stage 13#14Problems being solved in the GENERATION STAGE….. Problem: Waste generated disposed off haphazardly Solution taken: ■■■ No good waste management practices reduce, reuse, recycle - ■ Source Segregation of waste ■Storage at source before collection ■ Trade Waste not collected systematically Construction Debris not collected Bio-Medical Waste mixed with MSW. 14#15MSW MANAGEMENT AT THE CAPITAL COMPLEX Interventions at each stage: Generation Stage 1 •Collection Stage 2 3 4 • Transportation Stage Disposal Stage 15#16GARBAGE DISPOSAL AT ITANAGAR NAHARLAGUN TOWNSHIP ON AN AVERAGE GARBAGE GENERATION Total Population of Capital Complex (Itanagar & Naharlagun) as per 2011 census = 1,70,000 Garbage Generation Rate = 0.450 Kg per person per day Total Garbage Generated = 0.450 x 1,70,000 = 76,500 Kg = ( 76.5 MT)#17Name of the Project: - Setting up of Municipal Solid Waste Management in a Scientific Way for Capital Complex, Itanagar. Capacity of Treatment plant Production of manure Source of funding Date of Sanction of project Date of start of the project Date of completion (compost plant) Project area: 13.61 acres : 50.00 MT. per day and 50MT of secured landfill :15% of treated garbage i.e. 7.50 MT. per day : UIG components of JNNURM : 23/02/2007 : 05/04/2009 : 07/03/2013(Inaugurated by HCM, AP) Built-up area: 2.0 acres 17#18Problems being solved in the Collection and Transportation Stage... PROBLEM: Inadequate Collection infrastructure SOLUTION ADOPTED: ■ Segregated waste collected separately ■ Alignment of collection system in terms of numbers and type of waste generated Door to door collection Adequate tools like long handled brooms and protection gears provided for street sweepers Manual handling of waste obviated Multiple handling at various stages reduced Community involvement and private participation □ PROBLEM: Waste transportation not rationalized SOLUTION ADOPTED: Route plan - secondary roads can be catered. Systematic analysis of requirement - type and number Closed Container Vehicles instead of Open Vehicles#19Primary Collection Vehicles 24/10/2011 24/10/2011 02/01/2006 19#20A. Primary Collection System ➤ Door to door collection of the garbage from 7 AM to 2 PM has been adopted. ➤ Sweeping of roads & streets of each colonies/Sectors is being done on daily basis. Segregation at source has been adopted by providing two bins for "Dry-Waste" & "Wet-Waste" separately. Twin bins Litter Boxes to collect garbage at public places, parks and so on installed ➤ Bio-medical waste has not been allowed to mixed with Municipal Solid Waste. Installation of incineration in Complex. separate the respective Hospital/Clinical 20#21Side Loaders for Street Sweeps 21 21#22Dumper Placer Containers 22#23B. Secondary Collection System ➤ Temporary waste collection stations like dumper placer containers being provided at convenient or strategic places through which door to door collection of garbage is being deposited. ➤ The stored depot has been provided for both Bio- degradable & non Bio-degradable separately. Waste Collection Infrastructure like refuse collection bins, dumper placers with hydraulic system, twin litter box etc. has been placed. 23#24PPPP-Community Involvement Locality NGO's Community Involvement Informal Sector Private Sector 24#25MSW MANAGEMENT AT THE CAPITAL COMPLEX Interventions at each stage: 1 2 3 • Generation Stage Collection Stage • Transportation Stage Disposal Stage 4 25 25#26C. Transportation Collection System Rationalization of type and number of waste transportation vehicle undertaken ➤ Waste collected at the temporary storage depot of secondary collection system are being transported to the plant site. Waste collected through door to door collection are being transported directly to the plant site. ➤ The transportation system like refuse collector specially designed for Street Sweeping having 8 cum, closed container vehicles like garbage tipper trucks, dumper placers along with containers are being used. 26#27PRIMARY COLLECTION - ITANAGAR VEHICLE REQUIREMENT ANALYSIS Ward No Population Projected Pop Kgs Waste Generated in per Zone in Kgs Waste Generated B Sector 714 2077 945 A Sector 1395 4058 1846 P Sector 240 698 318 Raj Bhavan 2750 7999 3639 M Gate 235 684 311 N Lapang 330 960 437 ZONE -1 Adi Bosti 375 1091 496 7992 O Point 2075 6035 2746 M Colony 245 713 324 C House 241 701 319 ZONE -2 Air Road 2675 7781 3540 6929 Daily Market 2099 6105 2778 C Sector 2449 7123 3241 C-1 Sector 699 2033 925 ZONE - 3 C-2 Sector 1049 3051 1388 8332 D Sector 1420 4130 1879 RWD Colony 1049 3051 1388 ESS Sector 2350 6835 3110 ZONE - 4 MLA Cottage 1675 4872 2217 8594 27#28PRIMARY COLLECTION - ITANAGAR VEHICLE REQUIREMENT ANALYSIS E Sector 4898 14246 6482 ZONE -5 F Sector 1193 3470 1579 8061 Div IV 1399 4069 1851 G Sector 1667 4849 2206 G Market 2113 6146 2796 G Extension 478 1390 633 ZONE - 6 U/V Vihar 1191 3464 1576 9063 H Sector 1905 5541 2521 L/v Vihar 1925 5599 2548 Poly College 1230 3578 1628 Police Colony 245 713 324 ZONE-7 Chandranagar 1430 4159 1892 8913 KV School 714 2077 945 G Tiniali 720 2094 953 WE & S Colony 238 692 315 Bank Tinali 2799 8141 3704 MOWB-1 1399 4069 1851 ZONE-8 MOWB-2 699 2033 925 8694 M Bungalow 974 2833 1289 Niti Vihar 952 2769 1260 Driver Colony 715 2080 946 ZONE-9 Senki View 720 2094 953 4448 Total 156103 71024#29MSW MANAGEMENT AT THE CAPITAL COMPLEX Interventions at each stage: • Generation Stage 1 • Collection Stage 2 • Transportation Stage 3 4 •Disposal Stage 29 29#30Problems being solved in Disposal System... PROBLEM: Present Disposal system not scientific SOLUTION ADOPTED: ■ Open dumping system with attendant negative effects due to open dumping like breeding of disease vectors ■Requirement of area continue to increase No Resource Recovery hence system was unsustainable in the long run ■ Development of Recyclable market 30#31D. Compost Plant The Bio-degradable waste from the secondary collection system are being sent to compost plant for undergoing treatment process in a scientific way after the segregation. Bio-culture components call Bio-cullum (inoculants) which is composition of herbal extracts, Bio-enzyme & additives of Bio-nature are mixed with the garbage to convert the garbagbe into a manure. ➤ Non Bio-degradable waste are being segregated at the trommel screen chamber which are being dispose off to landfill site with other unwanted waste products in a scientific manner. 15% of the waste treated are being converted to manure per day. 31#32Interventions made for Disposal □ Disposal Plant being established scientifically: Aerobic Composting Plant ☐ Biological Process ■ Windrow Platform □ Mechanical Process ■ Screening with 35mm, 16mm until - 3mm ■Gravity Separator ☐ Biological Refining Process Integrated Engineered Sanitary Landfill □ HDPE Liners, Clay Liners, Drainage Layer Leachate Collection Pipes PPP mechanism for effective operation 32#33Old View of Site at Chimpu 83#34Over View of Municipal Solid Waste Management Plant Finished good store & Others Process Tower Semi-finished good store Trome Window Platform 23/02/2012 11:03#35Over View of Municipal Solid Waste Management Plant Trome Windrow Platform PARITATAL 23/02/2012 11:09#36Semi finished Platform of Municipal Solid Waste Management Plant 02/12/2012 14:31#37IN Internal Roads of Municipal Solid Waste Management Plant 02/12/2012 14:29#38Internal Roads of Municipal Solid Waste Management Plant 02/12/2012 14:36#39Composting in process FAVAVAZAL VAYAYAYA 26/04/2013 10:09#4026/04/2013 10:09#41Tilting in process JCB JCB ATATALEA AZ ZAVZEV SAZJAVA IZ VATALAAN SAA 26/04/2013 10:13#42MIKI XIXINTE JCB UCB YEHR-V ZA VEZAVALIZI MEZZ 26/04/2013 10:13 42#43Technology adopted for treatment of Biodegradable Waste: Aerobic Microbial Composting □ Bio-degradable component of waste is composted □ High organic matter, suitable moisture content and low calorific value of waste makes composting viable ☐ Finished compost can be classified as a 100% organic fertilizer Water Vapour, Heat, Co₂, No., Other Gases Raw Product Carbon, Nitrogen, Inorganics, Water Microorganisms, Pathogens, Weed Seeds, Beneficial Microbes Oxygen Compost Pile Mixing Composting Process End Product Curing Organic Matter, Inorganic Microorganisms 43#44Process Flow - Block Diagram Windrow Trommel 35,16 mm Semi-finished storage Loose VibroScreen Destoner Storage 6mm Fortification Bags VibroScreen 3mm 44#451.5mm thick hdpe sheet gas vent pipe Unscreened sandw pebbles layer 20cms thick 1.0m Refuse 1.0m 1.0m 1.0m Refuse grass vegetation -60cm thick soll layer 15cm thick soll layer WASTE 1.5mm thick hdpe sheet Formation of ground- -30cm thick soll layer -30cm th. sand/gravel 355mm dla hdpe perforated plpe 110mm dla hdpe perforated plpe COMPONENTS OF COVER, DRAINAGE & VENT SYSTEM Secured Landfill PROTECTIVE LAYER 10CM (SAND) HDPE GEOMEMBRANE 1.5MM LAYER ANULAR SOIL K10-2 COMPACTED CLAY/ AMENDED SOIL LINER SYSTEM FOR BOTTOM 60 CM 10 30 CM 45#46Environmental Impact Assessment (EIA) Environmental Management Plan (EMP) □ Some Mitigation Measures adopted: Water: Leachate Treatment Plant ■ Windrow runoff: Separate drain to take runoff to Leachate sump which is finally drained to the Leachate Treatment Plant ■ Air: Closed Container Vehicles, Regular schedule for inspection of vehicles Green Belt Development with trees with high foliage density to form a dense canopy around the disposal area 46#47Other Interventions under way... ☐ Financial ■ Inadequate resource base to support high costs of Solid Waste Management so a self-supporting and sustainable system with adequate community participation adopted ■ Zone-wise collection to be outsourced under the purview of the UD&H Department. Institutional Capacity building required to develop human resources to develop good waste management practices at the locality level. □ Social lack of awareness towards segregation at source and good waste management practices especially 3R's Reduce, Recycle and Recover Funding for IEC and manpower being made available to the UD&H Department 47#48Other Interventions under way... Cont'd ☐ Social ... Continued ■Community sensitization will require continual and sustained efforts and resources ■ Integration of public and private sector efforts in waste management □ Market Development of end-products Support for recyclables market development and Plastic and Paper recycling Plants Market support for compost - Subsidies, Promotion by Agriculture, Horticulture, Soil Conservation, Fisheries and other Departments 48 88#49SUMMARY OF PROJECT INTERVENTIONS ☐ Generation ■Segregation at Source ■Storage at Source ■Good waste mgmt. practices: Reduce, Reuse and Recycle □ Collection and Transportation ■ Community Involvement ■■ Private Participation Door to Door Collection ■Secondary Collection through dumper containers ■Routing and Rationalization ■Final Transportation to Disposal Site. □ Treatment and Disposal ■Compost Plant for biodegradable waste Secured Sanitary Landfill for non-recyclable waste ■Recyclables disposed through existing market mechanisms#50MSW Plant in other towns of Arunachal Pradesh With the successful commissioning & operational of Compost plant at Itanagar, The Govt. of Arunachal Pradesh is planning to establish MSW plant in another 10(ten) towns of Arunachal Pradesh. □ Project shall be submitted or being submitted to the GOI for sanction. 50#51Thank YOU 51

Download to PowerPoint

Download presentation as an editable powerpoint.

Related

Expanding in Circular Economy image

Expanding in Circular Economy

Waste Management & Sustainability

Waste Connections: Investment and ESG Overview image

Waste Connections: Investment and ESG Overview

Waste Management

Kinnevik Investor Event Presentation Deck image

Kinnevik Investor Event Presentation Deck

Financial Services

Pathward Financial Results Presentation Deck image

Pathward Financial Results Presentation Deck

Financial Services

Icahn Enterprises Activist Presentation Deck image

Icahn Enterprises Activist Presentation Deck

Financial Services

Rubicon Technologies SPAC Presentation Deck image

Rubicon Technologies SPAC Presentation Deck

Technology

First Busey Results Presentation Deck image

First Busey Results Presentation Deck

Financial Services

Endeavour Mining Investor Presentation Deck image

Endeavour Mining Investor Presentation Deck

Materials