Investor Presentaiton slide image

Investor Presentaiton

Nielle permit... Building on a strong resource base Djinni Target Surface trenching confirms presence of sheared and altered sedimentary package with disseminated Au-bearing sulphide, c.600m to the SW. Additional RC and AC drilling planned in Q1'19 to extend current 500m strike both NE and SW in oxide Mercator Remodeling highlights potential for additional ounces in South Zone corresponding to wide Au-in-soil anomaly Q1'19 drilling planned to test southern extension towards mineralization at Jane (Badenou) Jane (prev. Badenou) Wide envelope of Si-Ser-CO3 alteration, associated with boxworks, intersected in AC, south along strike of Mercator: BDAC014: 15m @ 2.5g/t from 0m BDAC028: 42m @ 1.86g/t from 0m Strike extension from Mercator now more than 2.5km Deposit Identified target Follow up target ZD 5km BARRICK Shadow Follow-up trenching confirms presence of vein- hosted mineralization: SHTR002: 8m @ 2.27g/t from 4m Follow-up AC planned for Q1 TTZ Badénou Corridor Follow-up Q1'19 RC and AC drilling to infill gaps and extend strike of known targets along 15km Badénou Corridor Shear-zone hosted disseminated Au-in- sulphide mineralization along volcanic/metased contact with local dioritic intrusive Conceptual targets from regional soil remodel continue to feed base of Resource Triangle: Ourapa, Zulu and Jane East targets.
View entire presentation