Investor Presentaiton
Nielle permit...
Building on a strong resource base
Djinni Target
Surface trenching confirms presence of
sheared and altered sedimentary
package with disseminated Au-bearing
sulphide, c.600m to the SW.
Additional RC and AC drilling planned in
Q1'19 to extend current 500m strike both
NE and SW in oxide
Mercator
Remodeling highlights potential for
additional ounces in South Zone
corresponding to wide Au-in-soil anomaly
Q1'19 drilling planned to test southern
extension towards mineralization at Jane
(Badenou)
Jane (prev. Badenou)
Wide envelope of Si-Ser-CO3 alteration,
associated with boxworks, intersected in
AC, south along strike of Mercator:
BDAC014: 15m @ 2.5g/t from 0m
BDAC028: 42m @ 1.86g/t from 0m
Strike extension from Mercator now more
than 2.5km
Deposit
Identified target
Follow up target
ZD
5km
BARRICK
Shadow
Follow-up trenching
confirms presence of vein-
hosted mineralization:
SHTR002: 8m @ 2.27g/t
from 4m
Follow-up AC planned for
Q1
TTZ
Badénou Corridor
Follow-up Q1'19 RC and AC
drilling to infill gaps and extend
strike of known targets along
15km Badénou Corridor
Shear-zone hosted
disseminated Au-in-
sulphide mineralization
along volcanic/metased
contact with local dioritic
intrusive
Conceptual targets from
regional soil remodel continue
to feed base of Resource
Triangle: Ourapa, Zulu and
Jane East targets.View entire presentation