Investor Presentaiton
Appendix E cont. - Mercator AOI
Significant Intercepts¹ contd.
All Drill Results
Including
TARGET Type
Mercator DDH NEDH001
Drill Hole2
Azimuth Dip Interval (m) Width (m)
Au (g/t)
Interval (m)
Width (m)
Au (g/t)
093 -54
129 130
1.0
0.7
Mercator DDH
NEDH001
093
-54 136 140.2
4.2
0.6
Mercator DDH
NEDH001
093
-54 175.5 176.6
Mercator DDH NEDH001
Mercator DDH NEDH001
Mercator DDH NEDH001
Mercator DDH
Mercator DDH NEDH002
Mercator DDH NEDH002
Mercator DDH NEDH003
Mercator DDH NEDH003
Mercator DDH NEDH003
Mercator DDH
093 -54 85.2 111.8
26.6
093 -54
57.7 59
093
-54
68-69.7
NEDH002
091
-52
118 127.3
091
-52
132.8 - 140.1
091
-52
141.1 - 145.9
090 -50
118 133
090 -50
94 115
090 -50
73 75.7
NEDH003
090
-50
81 86.1
Mercator DDH
NEDH004
090
-52
150.75-156
Mercator DDH
Mercator DDH NEDH005
Mercator DDH NEDH006
Mercator DDH NEDH006
Mercator DDH NEDH007
Mercator DDH NEDH008
NEDH005
091
-50
122.8 123.9
091
-50
142.1-144
089
-52
180.4 - 192.8
089
-52 209.2 - 227.7
089
-52 111.9 114.2
1637
161-2745225511282
1.1
2.4
2.6
97-99.9
2.9
1.3
0.9
1.7
0.3
9.3
1.2 126.3 127.3
1
7.3
0.9
4.8
3.1 142.1 143.1
15.0
1.0
21.0
1.0
2.7
1.1
5.1
0.8
5.3
1.0
1.1
0.9
1.9
0.4
12.4
1.6
180.4 181.4
1
18.5
2.0
221-221.7
0.7
2.3
0.8
089
-52
109 110
1.0
1.0
Mercator DDH
NEDH009
090
-50
173.9 180.6
6.7
2.1
Mercator DDH
NEDH009
090 -50
191.3 199.5
8.2
1.0
Mercator DDH
NEDH009
090
-50
98-105.9
7.9
0.9
Mercator DDH
Mercator DDH NEDH010
Mercator DDH NEDH010
NEDH010
095
-50
145.1 152.9
7.8
1.1
095
-50
172.1-180
7.9
0.9
095 -50
33.7 39
5.3
2.1
37-38.2
1.2
BARRICK
1. All intercepts calculated using a 0.5g/t
Au cutoff and are uncapped; minimum
intercept width is 2m; internal dilution is
less than 25% total width.
5.4 2. Mercator drill hole nomenclature: MT
(Mercator) followed by type (DG: Diamond
Core) with no designation of the year.
3. True width of intercepts are uncertain at
12 this stage.
5.22
5.24
4. Includings defined as any interval with a
weighted average Au g/t equal to or
greater than 5g/t.
The drilling results for the Nielle property
contained in this presentation have been
6.7 prepared in accordance with National
Instrument 43-101 -Standards of
Disclosure for Mineral Projects. All drill
hole assay information has been manually
reviewed and approved by staff geologists
and re-checked by the project manager.
Sample preparation and analyses are
conducted by an independent laboratory.
Procedures are employed to ensure
security of samples during their delivery
from the drill rig to the laboratory. The
quality assurance procedures, data
verification and assay protocols used in
connection with drilling and sampling on
the Nielle property conform to industry
accepted quality control methods.
5.09View entire presentation